1 Time Series for Hewes Point, North end of the Chandeleur Islands 1984 - 2007 Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University of New Orleans Karen A Westphal

2 The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison. The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison.

3 Location of Hewes Point, Chandeleur Islands, Louisiana Hewes Point is the north end of Chandeleur Island and is in BICM region “Chandeleur Islands” and BICM segment 59 “Chandeleur Islands”

4 1984 30 º 03'15"/88 º 52'28 ” view to the south July 9, 1984

5 1985 30 º 03'15"/88 º 52'28 ” view to the south July 10, 1985

6 1985 post-Hurricane Juan 30 º 03'15"/88 º 52'28 ” view to the south November 6, 1985

7 1986 30 º 03'15"/88 º 52'28 ” view to the south July 23, 1986

8 1987 30 º 03'15"/88 º 52'28 ” view to the south July 9, 1987

9 1988 30 º 03'15"/88 º 52'28 ” view to the south July 14, 1988

10 1989 30 º 03'15"/88 º 52'28 ” view to the south July 19, 1989

11 1990 30 º 03'15"/88 º 52'28 ” view to the south June 25, 1990

12 1991 30 º 03'15"/88 º 52'28 ” view to the south July 18, 1991

13 1992 30 º 03'15"/88 º 52'28 ” view to the south August 30, 1992

14 1993 30 º 03'15"/88 º 52'28 ” view to the south June16, 1993

15 1996 30 º 03'15"/88 º 52'28 ” view to the south July 17, 1996

16 1998 post-Hurricane Georges 30 º 03'15"/88 º 52'28 ” view to the south October 1, 1998

17 1999 30 º 03'15"/88 º 52'28 ” view to the south August 27, 1999

18 2001 30 º 03'15"/88 º 52'28 ” view to the south June 14, 2001

19 2002 post-Tropical Storm Isodore 30 º 03'15"/88 º 52'28 ” view to the south October 1, 2002

20 2002 post-Hurricane Lili 30 º 03'15"/88 º 52'28 ” view to the south October 6, 2002

21 2004 post-Hurricane Ivan 30 º 03'15"/88 º 52'28 ” view to the south September 18, 2004

22 2005 post-Hurricane Katrina 30 º 03'15"/88 º 52'28 ” view to the south September 30, 2005

23 2007 30 º 03'15"/88 º 52'28 ” view to the south April 20, 2007

24 1984 1993 9 Years

25 1993 2004 11 Years

26  2004 Post-Ivan  2005 Post-Katrina 1 Year

27 1984 2007 23 Years

28 Relevant Coastal Restoration Projects  Chandeleur Islands Marsh Restoration  State Project Number: PO-27 Project Priority List (PPL): 09 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Type: Vegetation Planting Construction Completion Date: 2001 Description: This project is intended to accelerate the recovery period of barrier island areas overwashed by Hurricane Georges in 1998 through vegetation plantings. The overwash areas, which encompass 364 acres, are located at 22 sites along the Chandeleur Sound side of the island chain and were planted with smooth cordgrass (Spartina alterniflora). http://dnr.louisiana.gov/crm/coastres/projectlist.asp  Chandeleur Islands Marsh Restoration  State Project Number: PO-27 Project Priority List (PPL): 09 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Type: Vegetation Planting Construction Completion Date: 2001 Description: This project is intended to accelerate the recovery period of barrier island areas overwashed by Hurricane Georges in 1998 through vegetation plantings. The overwash areas, which encompass 364 acres, are located at 22 sites along the Chandeleur Sound side of the island chain and were planted with smooth cordgrass (Spartina alterniflora). http://dnr.louisiana.gov/crm/coastres/projectlist.asp