Large Binocular Telescope Interferometer (UA) Q4 FY10 Exoplanet Presentation Philip Hinz - PI Thomas McMahon - PM LBTI 1.

Similar presentations


Presentation on theme: "Large Binocular Telescope Interferometer (UA) Q4 FY10 Exoplanet Presentation Philip Hinz - PI Thomas McMahon - PM LBTI 1."— Presentation transcript:

1 Large Binocular Telescope Interferometer (UA) Q4 FY10 Exoplanet Presentation Philip Hinz - PI Thomas McMahon - PM LBTI 1

2 Large Binocular Telescope Interferometer (UA) Project Overview OctSepAug Technical ScheduleResources Programmatic OctSepAugSepAugJulOctSepAug

3 Large Binocular Telescope Interferometer (UA) LBTI Summary Outstanding LBTI on-sky results during 1 st three nights on the sky Obtained instrument First Light! Obtained instrument first Fringes! Telescope is well behaved, i.e. stable enough to easily interfere the beams. Next LBTI Observing Block November 4-6 Concentrate on Adaptive Optics Imaging at 2-10µm Attempt initial interferometry science. FY11 Project Schedule Resources now available to support 10+ commissioning nights during FY11. NIC Imager scheduled to start commissioning in March 2011 A fraction of the nights will focus on science observations of key science targets. 3

4 Large Binocular Telescope Interferometer (UA) 4 FIRST Light and Fringes! Beta Peg : Combined 10µm image from the LBTI imager. Image is “seeing limited” under poor weather conditions (seeing ~1.2 arc sec). It does demonstrate the LBTI instrument and LBTO telescope’s 23 meter resolution capabilities and stability “right out of the box”.

5 Large Binocular Telescope Interferometer (UA) 5 The Next Observing Run November 4-6, 2010 LBTI November observing will be used to attempt two separate goals: 1.AO imaging, and 2.Interferometry Science. We will intersperse tasks from each area during the run, to maximize use of on-sky time.

6 Large Binocular Telescope Interferometer (UA) 6 Targets for the Next Observing Run

7 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments Instrument Shipped to LBTO on September 31, on schedule. Installed on Telescope September 2, two days ahead of schedule. 7 Sept 31: Instrument Arrives at noon Prepping the platform. We noticed some new obstacles to overcome Reassembling the instrument Day One

8 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 8 Installing the Wave Front Sensor fixtures. The wave front sensor sit inside the rotators (circular apertures) and have to be stowed out of the way while the beam combiner is installed Day Two, 15:00 Oct 1 Lifting the Wave Front Sensors onto the holding fixtures Working both sides of the primary. Oli Durvey finishes the Wave Front Sensor installation We were not able to gain access to the telescope until the MODS Facility instrument team finished with their day

9 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 9 Lifting the beam combiner to the telescope Day Two, 19:00 Oct 1 Lifting over the telescope. A very nervous 45 minutes 90 minutes later we are on the telescope! We were not able to gain access to the telescope until the MODS Facility instrument team finished with their day

10 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 10 Completing the electrical system Day Three to Nine, Oct 2 - 8 Activity on the telescope Aligning the imager pupil to the system Adjusting the DX wave front sensor

11 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 11 Day Ten, Oct 14… First Night of Observing Here the telescope is horizon pointing giving the best vantage point of the instrument mounted on the telescope

12 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 12 Day Ten, Oct 14… First Night of Observing Defocused 10µm image of the primaries showing secondary spider arms. This is the first image of both primaries on a single focal plane. Not the best night sky conditions… But then it cleared…

13 Large Binocular Telescope Interferometer (UA) FY 10-11 Commissioning Accomplishments 13 Day Ten, Oct 14… First Night of Observing First Light. A very comatic and out of focus stellar image at 10µm. All the time in the lab paid off… The beams were cleaned up and the wave front sensors were utilized. The image on the left in the pyramid pupil image from the right beam. And first Fringes… Combined image of Beta Peg in seeing- limited mode

14 Large Binocular Telescope Interferometer (UA) FY11 Commissioning 14 DXSX Adaptive Secondary Mirror (ASM) Unit #1 Fixed Secondary Telescope Present Configuration and Capabilities November ’10 - June ’11 One Adaptive Secondary System (right side). One Fixed Secondary System (left side). Binocular pointing mode commissioning. September ’11 - January ’12 2 AO Secondaries One being commissioned One operational Binocular pointing mode commissioned Telescope Configuration in 2010-11

15 Large Binocular Telescope Interferometer (UA) 15 Near Term Commissioning Timeline The graph below indicates the top level commissioning schedule and telescope schedule we anticipate to maintain over the next 12+ months.

16 Large Binocular Telescope Interferometer (UA) FY 2011 Goals Utilize the remaining nights to continue characterization of the telescope and interferometer. Perform preliminary science on select targets. Diffraction limited imaging from 3.5µm to 13µm Seeing limited speckle interferometry with 23 m baseline Prepare the system for diffraction limited interferometry. 16

17 Large Binocular Telescope Interferometer (UA) Telescope Milestones ItemMilestoneDate (Planned)Date (Completed)Status AO Unit #2 Hardware Acceptance10-Nov-09 Complete 1AO Unit # 1 Acceptance20-Dec-09 Complete 2AO Unit # 1 Arrival in AZ15-Feb-10Feb-15 Complete 3AO Unit # 1 Installation15-Mar-10Mar-6 Complete 4True Binocular Ops1-Dec-10 On Schedule 5Daytime AO Commissioning11-Jun-10Mar-20 Complete 6AO Unit # 1 on-sky commissioning30-Jan-11 In progress 7AO Unit # 2 Arrival in AZQ1 FY11 Now May ‘11 8AO Unit #2 CommissioningQ3 FY11 Now Sep ‘11 17 True Binocular Ops Definition: Activities in preparing the telescope for coordinated binocular (simultaneous) observations. Activities include Instrument ports commissioning, software, mirror mount upgrades, mirror covers, two secondary/tertiary mirrors operational. Daytime AO Commissioning Definition: Secondary mounted with artificial source at center of curvature (See image on next slide) and wave front sensor. Testing conducted during the daytime hours with dome closed. Repeat of test suite performed in Italy that will verify proper, and expected on-telescope performance. On-sky Commissioning Definition: Open dome, closed loop testing using natural guide star. Italians have asked for 50+ nights with seeing “good seeing”. This is the driver for the 4-5 month on-sky commissioning period. LBTI expect near normal AO operations to be achieved by late-Fall ‘10

18 Large Binocular Telescope Interferometer (UA) Instrument Milestones ItemMilestoneDate (Planned)ActualStatus 1Telescope re-installation7/27/109/2/10Completed 2First Light (seeing limited, fringes)9/1/1010/14/10Completed 32 Aperture Speckle imaging tests9/1/1010/14/10Completed 4NIC on-sky testing with MMT Telescope9/30/10Going directly to LBT in late Q2 FY11 5LBTI AO CommissioningQ4 FY1011/4/10Initial 3 night this week (Nov 4-6) 6Single Aperture AO Imaging (3-12µm)Q2 FY11Late Q1/early Q2 FY11 7AO Interferometry CommissioningQ4 FY11Start in Oct ’10, continued in FY12 due to FY11 funding profile 18 Telescope re-installation: Includes mechanical installation of the Beam Combiner, Wave Front Sensors, electronics. Internal alignment and integration included the instrument alignment with the optical axis of the telescope. Alignment will be accomplished with an infrared test camera, and prototype nulling interferometer (BLINC/MIRAC) LBTI AO Commissioning: Commissioning tasks associated with the operations of the first dedicated wave front sensor (Unit #1). Unit # 2 commissioning will take place after the AO Secondary Mirror unit #2 is commissioned in calendar 2011. AO Interferometry Commissioning: Commences after AO Secondary Mirror #2 is installed and commissioned and when funding profile supports the activity.

19 Large Binocular Telescope Interferometer (UA) Other Project Activities The Project has also pushed a head with the testing of the NIC imager: Limited progress due to limited resources… i.e. everyone was concentrating on support the installation and first observing run. Testing in continuing in the lab with performance characterization. LMIRCam testing finishing up in Virginia. Expect delivery in late November. 19 Inside of of the NIC cryostat just prior to installation of detector systems in August

20 Large Binocular Telescope Interferometer (UA) Other Project Activities First light article in the Arizona Daily Star: http://azstarnet.com/news/local/education/college/article_d0bcb666-9378- 5330-abfc-09f58b536310.html Instrument Wiki and Blog page: http://zero.as.arizona.edu/groups/lbti/ NASA Feature Article due out November 9 20

21 Large Binocular Telescope Interferometer (UA) FY10/11 Project Schedule 21 See following slide for annotations

22 Large Binocular Telescope Interferometer (UA) Annotated FY10/11 Project Schedule 22 Final testing carried out after AO Unit #2 delivered. Today Will work on lab testing of imager until allowed to integrate with telescope Pre-ship review of Imager in late January/early February (to be scheduled) Canceled. Determined effort too great for limited resources and scheduling issues with MMT First opportunity to integrate and test imager on telescope Anticipated commissioning of AO Unit #2. Limited schedule information available

23 Large Binocular Telescope Interferometer (UA) Annotated FY11 Project Schedule 23 Observing Block 1 is complete We have 3 more scheduled nights. We have requested 6 additional nights in 2011A telescope period. AO Unit #2 is expected to be delivered in May prior to telescope summer shutdown (~2 month slip) Anticipate 3 month AO Unit #2 commissioning period between September and December 2011 LBTI AO Interferometry commissioning can take place concurrently with AO Unit #2 commissioning Anticipate transitioning to science operations in early calendar 2012

24 Large Binocular Telescope Interferometer (UA) Open Items 24 PlannedCompletedStatus/Description

25 Large Binocular Telescope Interferometer (UA) Problems & Concerns 25

26 Large Binocular Telescope Interferometer (UA) Problems & Concerns Description Item #1: LBT Schedule dependency - Telescope construction schedule is on the critical path. Current Status Completion of the interferometric capable telescope now scheduled for late Fall 2011. Expected Resolution/Impact LBTI expects to move forward with commissioning tasks to the limit of the telescope capabilities. AO Unit #2 remains on the critical path to Science Operations. Expect Unit #2 to be delivered in May 2011. 26 C

27 Large Binocular Telescope Interferometer (UA) Problems & Concerns Description Item #2: LBT Performance - Telescope performance has impacts on instrument productivity. Current Status Telescope commissioning continues. Presently no known issues of telescope performance are show stoppers. LBTO is actively addressing all issues. First light performance showed no issues that cannot be addressed and overcome before the observatory commissions interferometric capabilities. AO performance meets LBTI requirements. Expected Resolution/Impact LBTI project continues to monitor the evolution of the telescope system. 27 C

28 Large Binocular Telescope Interferometer (UA) Problems & Concerns Description Item #3: Instrument Integration Schedule - Instrument commissioning schedule is ambitious for 20 nights. Current Status LBTI struggles with sufficient funds for full commissioning schedule and with the log jam of telescope facility commissioning tasks that take priority. We have been able to jump the line and start limited commissioning. Project plan and finances support 10 nights of on-sky commissioning in FY11. Expected Resolution/Impact 28 C

29 Large Binocular Telescope Interferometer (UA) Problems & Concerns Description Item #5: FY 11 funding impacts upon commissioning. Current Status Retired/Resolved. Expected Resolution/Impact LBTI now has promise of sufficient funds to maintain staff level to support 10 nights of on-sky commissioning and possibility of ramping up/re-organizing staff to support start of science ops in FY12. 29 C

30 Large Binocular Telescope Interferometer (UA) Action Items 30 ACTION ITEM NO. DESCRIPTION STATUS: I/C* CLOSURE REFERENCE/ DOCUMENT ID *I = In Work/C = Complete

31 Large Binocular Telescope Interferometer (UA) Labor Summary 31

32 Large Binocular Telescope Interferometer (UA) FY 10 Project Finances 32

33 Large Binocular Telescope Interferometer (UA) FY11 Project Finances 33

34 Large Binocular Telescope Interferometer (UA) Risk 34 Approach M - Mitigate W - Watch A - Accept R - Research Med High Low Criticality L x C Trend Decreasing (Improving) Increasing (Worsening) Unchanged New Since Last Period No change from last reporting period.

35 Large Binocular Telescope Interferometer (UA) Risk Focus 35