Download presentation
Presentation is loading. Please wait.
Published byNoreen Lloyd Modified over 8 years ago
1
Director of Buildings' Office Slide no.1 April 03-June06 Trinity College Universal Design Issues Access Cobble Reduction Access to Historic (Protected) Buildings
2
Director of Buildings' Office Slide no.2 April 03-June06 Trinity College Universal Design Issues Access Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:21 Slide number: 2 Number of objects: 3 Sizes: Slide total: 980.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
3
Director of Buildings' Office Slide no.3 April 03-June06 Trinity College Universal Design Issues Temporary/immediate solutions House 39 – Law SchoolAnatomy Building Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:50 Slide number: 3 Number of objects: 7 Sizes: Slide total: 2.1 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 10.0 KB Hide Erase
4
Director of Buildings' Office Slide no.4 April 03-June06 Trinity College Universal Design Issues Permanent solutions Historic Buildings Front Square Houses New access ramps Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:04 Slide number: 4 Number of objects: 6 Sizes: Slide total: 941.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
5
Director of Buildings' Office Slide no.5 April 03-June06 Trinity College Universal Design Issues Permanent solutions - Historic Buildings House 27Entrance to Catex Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:25 Slide number: 5 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
6
Director of Buildings' Office Slide no.6 April 03-June06 Trinity College Universal Design Issues Permanent solutions Historic Buildings The Old LibraryThe GMB (Sounder/beacon retrofitted) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:44 Slide number: 6 Number of objects: 7 Sizes: Slide total: 1.7 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
7
Director of Buildings' Office Slide no.7 April 03-June06 Trinity College Universal Design Issues Permanent solutions Historic Buildings Cobble Reduction Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:04 Slide number: 7 Number of objects: 5 Sizes: Slide total: 1.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
8
Director of Buildings' Office Slide no.8 April 03-June06 Trinity College Universal Design Issues Permanent solutions - New Buildings East End 4/5 SNIAMS (automatic doors) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:30 Slide number: 8 Number of objects: 7 Sizes: Slide total: 1.9 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
9
Director of Buildings' Office Slide no.9 April 03-June06 Trinity College Universal Design Issues Permanent solutions - New Buildings Berkeley Podium (ramp)Ussher Podium (platform lift) Sounder/beacon retrofitted) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:58 Slide number: 9 Number of objects: 8 Sizes: Slide total: 1.6 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
10
Director of Buildings' Office Slide no.10 April 03-June06 Trinity College Universal Design Issues Permanent solutions - Existing Buildings Lecky Library (Arts Building) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:16 Slide number: 10 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
11
Director of Buildings' Office Slide no.11 April 03-June06 Trinity College Universal Design Issues Permanent solutions- New Buildings Ussher/Berkeley Library (ramp and lift) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:33 Slide number: 11 Number of objects: 7 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
12
Director of Buildings' Office Slide no.12 April 03-June06 Trinity College Universal Design Issues General Facilities UA Toilet Desiginated Parking Bay Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:46 Slide number: 12 Number of objects: 8 Sizes: Slide total: 1015.0 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
13
Director of Buildings' Office Slide no.13 April 03-June06 Trinity College Universal Design Issues Permanent solutions- New Buildings Ussher/Berkeley Library (ramp and lift) Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:03 Slide number: 13 Number of objects: 6 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
14
Director of Buildings' Office Slide no.14 April 03-June06 Trinity College Universal Design Issues Interim solutions Portable Ramp Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:34 Slide number: 14 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
15
Director of Buildings' Office Slide no.15 April 03-June06 Trinity College Universal Design Issues General Requirements Mobility: ease of access for all Hearing: Induction loops, strobe alarms Vision: Tactile clues, lighting, audible alarms Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:38 Slide number: 15 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
16
Director of Buildings' Office Slide no.16 April 03-June06 Trinity College Universal Design Issues Completed Projects – Lecture Halls Accessible for all new buildings Note: Access to lecture theatres in old buildings to be considered. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:41 Slide number: 16 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
17
Director of Buildings' Office Slide no.17 April 03-June06 Trinity College Universal Design Issues Completed Projects – Goldsmith Hall Residences All units accessible by lift All units ‘visitable’ and adaptable when required. Specifically designed bathrooms available. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:44 Slide number: 17 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
18
Director of Buildings' Office Slide no.18 April 03-June06 Trinity College Universal Design Issues Completed Projects – Botany Bay Residences Refurbishment Provision of 9 no places in 3 no. units Each unit is fully adapted to suit Universal Design requirements Including specifically designed kitchens and bathrooms In addition facilities can be provided for both the visually impaired and deaf persons in the remaining units. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:47 Slide number: 18 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
19
Director of Buildings' Office Slide no.19 April 03-June06 Trinity College Universal Design Issues Current Programs/Projects - Trinity Hall Residences Each of the three new buildings is fully accessible All apartments are 'visitable‘ 45 of 938 bed spaces are enabled bed spaces with specially designed toilet/shower facilities with 'nurse call' system centrally monitored and enabled kitchen facilities. Each apartment has an 1800 turning circle for wheelchair access. All switches, door furniture etc are universally accessible-visibility socket switches fitted Specifically designated parking bays Provision of facilities for both the visually impaired and deaf occupants. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:49 Slide number: 19 Number of objects: 4 Sizes: Slide total: 106.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
20
Director of Buildings' Office Slide no.20 April 03-June06 Trinity College Universal Design Issues Priority List 1 GMB: internal lift The Pavilion Bar: platform lift. East Theatre: automate entrance door. Arts Building (Faculty Area): automate doors/platform lift Chemistry Building: improve access to Large Lecture Theatre. Physiology/Zoology Building: Access provision. The Boathouse: provision of UA toilets Santry Pavilion: provision of UA toilets/changing room Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:52 Slide number: 20 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
21
Director of Buildings' Office Slide no.21 April 03-June06 Trinity College Universal Design Issues Priority List - General Induction Loop System Deaf alerter – Fire Alarms. Cobble reduction. Improve external/internal circulation routes Visual/tactile provisions. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:55 Slide number: 21 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Hide Erase
22
Director of Buildings' Office Slide no.22 April 03-June06 Trinity College Universal Design Issues For Consideration Front Square: Access provision/automate doors Provost’s House: Access provision. New Square: Access provision/automate doors East End: Improve access to existing buildings. Islandbridge: improve access/lift installation/UD facilities. Santry Pavilion: improve access/lift installation/UD facilities. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:57 Slide number: 22 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Hide Erase
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.