Presentation is loading. Please wait.

Presentation is loading. Please wait.

Avcstl.ppt 05/2005Version 2.11 U.S.C.G. AUXILIARY EIGHTH WESTERN RIVERS REGION AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Available on the.

Similar presentations


Presentation on theme: "Avcstl.ppt 05/2005Version 2.11 U.S.C.G. AUXILIARY EIGHTH WESTERN RIVERS REGION AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Available on the."— Presentation transcript:

1 avcstl.ppt 05/2005Version 2.11 U.S.C.G. AUXILIARY EIGHTH WESTERN RIVERS REGION AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Available on the Internet at: http://www.trlmo.com/cgaux8wr/aton/avclstl.ppt http://www.trlmo.com/cgaux8wr/aton/avclstl.ppt Using Microsoft PowerPoint Viewer

2 avcstl.ppt 05/2005Version 2.12 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS INDEX TO TOPICS INTRODUCTION AND BACKGROUND DESCRIBING A LIGHT’S CHARACTERISTICS VERIFYING A LIGHT'S CHARACTERISTICS TIMING A LIGHT TECHNIQUES FOR TIMING LIGHTS CHECKING A LIGHT'S FOCUS WHEN IS A LIGHT CONSIDERED TO BE "WATCHING PROPERLY"? REPORTING PRIVATE AID VERIFICATIONS IDENTIFYING SPECIFIC PRIVATE AID LIGHTS REPORTING THE RESULTS -- SUMMARY

3 avcstl.ppt 05/2005Version 2.13 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS INTRODUCTION AND BACKGROUND MOST LIGHTED AIDS TO NAVIGATION ARE EQUIPPED WITH A DAYLIGHT CONTROL –WHICH AUTOMATICALLY CAUSES THE LIGHT TO OPERATE (ON) DURING DARKNESS AND TO BE OFF DURING DAYLIGHT EACH LIGHT IS UNDER ITS OWN CONTROL –THEREFORE ALL LIGHTS DO NOT COME ON OR GO OFF AT THE SAME TIME AID VERIFIERS MUST ASSURE THERE IS SUFFICIENT DARKNESS TO WHERE A LIGHT SHOULD BE OPERATING –BEFORE REPORTING THE LIGHT AS "EXTINGUISHED" (DEFECTIVE)

4 avcstl.ppt 05/2005Version 2.14 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS DESCRIBING A LIGHT'S CHARACTERISTICS THREE FACTORS ARE USED TO DESCRIBE A LIGHT'S CHARACTERISTICS: 1) LIGHT RHYTHM – LIGHTED AIDS TO NAVIGATION ARE EITHER "FIXED" (CONTINUOUSLY ON) OR GENERALLY EXHIBIT RHYTHMS SUCH AS: "FLASHING", "OCCULTING", "ISOPHASE", ETC. (SEE NEXT CHART) 2) LIGHT PERIOD – FOR OTHER THAN "FIXED" LIGHTS, THE TIME IN SECONDS DURING WHICH THE PATTERN OF FLASHES IS REGULARLY REPEATED 3) LIGHT (LENS) COLOR – RED AND GREEN (HAVE LATERAL SIGNIFICANCE) – WHITE AND YELLOW (HAVE NO LATERAL SIGNIFICANCE) FOR EXAMPLE: A LIGHT WITH PUBLISHED CHARACTERISTICS OF " Fl G 6s " WOULD HAVE A FLASHING LIGHT RHYTHM, GREEN LENS COLOR, ONE FLASH PER PERIOD, AND A PERIOD OF SIX SECONDS.

5 avcstl.ppt 05/2005Version 2.15 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Light Rhythm Light List Example Description / Definition Fixed F A light showing (ON) continuously and steadily. Flashing Fl Total time light is OFF is longer than the total time light is ON and there is a single flash each period. Occulting Oc Total time light is ON is longer than the total time light is OFF and the flashes are usually of equal duration. Isophase Iso Total time light is ON is equal to the total time light is OFF. Group-Flashing Fl (2) Group of flashes, specified in number, is repeated in regular sequence and the flashes are of equal duration. Composite Group-Flashing Fl (2+1) Multiple groups in a period, each group having a different number of flashes, are repeated in regular sequence. DESCRIBING A LIGHT'S CHARACTERISTICS TABLE BELOW SHOWS LIGHT RHYTHMS TYPICAL ON THE INLAND RIVERS.

6 avcstl.ppt 05/2005Version 2.16 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS DESCRIBING A LIGHT'S CHARACTERISTICS IF A LIGHT HAS PUBLISHED CHARACTERISTICS OF: Fl (2) R 6s WHAT IS THAT LIGHT'S: LIGHT RHYTHM ________________________________________ LIGHT PERIOD _________________________________________ LIGHT (LENS) COLOR ___________________________________

7 avcstl.ppt 05/2005Version 2.17 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS AIDS WITH FIXED CHARACTERISTICS – ARE CONTINUOUSLY "ON" AND ARE SHOWN IN THE LIGHT LIST WITH CHARACTERISTICS OF "F R" (FIXED RED), "F G" (FIXED GREEN) OR "F W" (FIXED WHITE) – SHOULD BE VERIFIED TO ASSURE THAT: LIGHT IS IN FOCUS UPSTREAM AND DOWNSTREAM -- LAMP FIXTURE IS NOT LEANING MORE THAN 15 DEGREES, NOT COMPROMISED BY BRUSH OR TREES LAMP IS IN GOOD SHAPE -- NOT EXTINGUISHED OR DIM, NOT COMPROMISED BY BIRD NESTS OR FOULING AIDS WITH FLASHING CHARACTERISTICS – IN ADDITION TO THE ABOVE VERIFICATIONS, MUST ALSO BE TIMED TO VERIFY THAT THE CHARACTERISTICS ARE AS PUBLISHED IN THE LIGHT LIST. NOTE: MANY PRIVATE AIDS ARE SHORE POWERED (VS BATTERY POWERED) AND MAY NOT USE A DAYLIGHT CONTROL TO TURN THE LIGHT OFF DURING DAYLIGHT HOURS. THE LIGHT MAY BE "ON" 24 HOURS A DAY. THIS IS NOT A DISCREPANCY.

8 avcstl.ppt 05/2005Version 2.18 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS NUMBER OF FLASHES EXPECTED IN ONE MINUTE IS CALCULATED BY: 1.DETERMINING THE "PERIOD" AND THE NUMBER OF FLASHES PER PERIOD FROM THE CHARACTERISTICS PUBLISHED IN THE LIGHT LIST EXAMPLE: IF THE PUBLISHED CHARACTERISTICS ARE SHOWN AS " Fl (2) R 6s", THE PERIOD IS SIX SECONDS AND THE NUMBER OF FLASHES PER PERIOD IS TWO. 2.DETERMINING THE NUMBER OF PERIODS PER MINUTE BY DIVIDING SIXTY SECONDS BY THE PERIOD EXAMPLE: A LIGHT WITH A PERIOD OF SIX SECONDS WILL HAVE TEN PERIODS PER MINUTE (60 DIVIDED BY 6) 3.MULTIPLYING THE NUMBER OF PERIODS PER MINUTE BY THE NUMBER OF FLASHES PER PERIOD EXAMPLE: [[TEN PERIODS PER MINUTE] X [TWO FLASHES PER PERIOD] EQUALS TWENTY FLASHES PER MINUTE. VERIFICATION OF A LIGHT'S CHARACTERISTICS REQUIRES TIMING EACH LIGHT FOR THE NUMBER OF FLASHES EXPECTED IN ONE MINUTE VERIFYING A LIGHT'S CHARACTERISTICS

9 avcstl.ppt 05/2005Version 2.19 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Fl (2) R 6s DURATION OF EACH PERIOD = _____ SECONDS NUMBER OF FLASHES PER PERIOD = _____. NUMBER OF PERIODS PER MINUTE = 60 / _____ = _____ NUMBER OF FLASHES PER MINUTE = _____ X _____ = _____ EXERCISE: DETERMINE THE NUMBER OF FLASHES EXPECTED IN ONE MINUTE TIMING A LIGHT

10 avcstl.ppt 05/2005Version 2.110 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Fl (2) R 6s DURATION OF EACH PERIOD = __ 6 __ SECONDS NUMBER OF FLASHES PER PERIOD = 2. NUMBER OF PERIODS PER MINUTE = 60 / 6 = 10. NUMBER OF FLASHES PER MINUTE = 10 X 2 = 20. TIMING A LIGHT EXERCISE: DETERMINE THE NUMBER OF FLASHES EXPECTED IN ONE MINUTE

11 avcstl.ppt 05/2005Version 2.111 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Characteristics as Published in the Light List Number of Periods per Minute Number of Flashes per Period Number of Flashes per Minute Fl (2) R 6s (Typical LDB PAtoN) 10220 Fl G 6s (Typical RDB PAtoN) Fl (2) R 5s (Typical LDB Federal AtoN) Fl G 4s (Typical RDB Federal AtoN) EXERCISE: COMPLETE THE FOLLOWING TABLE FOR THE LIGHT CHARACTERISTICS COMMONLY FOUND ON PRIVATE AND FEDERAL LIGHTED AIDS (THE FIRST ENTRY IS FOR THE EXAMPLE USED ON THE PREVIOUS CHART). TIMING A LIGHT

12 avcstl.ppt 05/2005Version 2.112 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Characteristics as Published in the Light List Number of Periods per Minute Number of Flashes per Period Number of Flashes per Minute Fl (2) R 6s (Typical LDB PAtoN) 10220 Fl G 6s (Typical RDB PAtoN) 101 Fl (2) R 5s (Typical LDB Federal AtoN) 12224 Fl G 4s (Typical RDB Federal AtoN) 151 EXERCISE: COMPLETE THE FOLLOWING TABLE FOR THE LIGHT CHARACTERISTICS COMMONLY FOUND ON PRIVATE AND FEDERAL LIGHTED AIDS (THE FIRST ENTRY IS FOR THE EXAMPLE USED ON THE PREVIOUS CHART). TIMING A LIGHT

13 avcstl.ppt 05/2005Version 2.113 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS TECHNIQUES FOR TIMING A LIGHT TIMING A LIGHTED AID REQUIRES A TIMING DEVICE THAT WILL GIVE ELAPSED TIME – MANY WRIST WATCHES HAVE THIS CAPABILITY HOWEVER, EXPERIENCE HAS DETERMINED THAT A SPORTS WATCH – MAY BE EASIER TO USE WITH ITS LARGE BUTTONS AND DISPLAY – USUALLY INEXPENSIVE, AVAILABLE AT K-MART, WAL-MART, RADIO SHACK, ETC. – BUT, USUALLY DOESN'T HAVE ILLUMINATED DISPLAY (REQUIRES NIGHT-VISION PROTECTED LIGHT SOURCE) ACTUAL TIMING: – MUST BE PERFORMED AT NIGHT – SHOULD START AND STOP AT THE END OF THE LAST FLASH IN A PERIOD TO ELIMINATE 'ANTICIPATION" – MUST BE PERFORMED AS A DEDICATED TASK, UNINTERRUPTED, BY AN INDIVIDUAL WITH NO OTHER ASSIGNED TASKS. EVERY AID VERIFIER WILL DEVELOP THEIR OWN "STYLE" FOR TIMING LIGHTS. THE FOLLOWING IS SUGGESTED ONLY AS A STARTING POINT FOR AUXILIARISTS NEW TO AID VERIFICATION.

14 avcstl.ppt 05/2005Version 2.114 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Fl (2) R 6s ONE PERIOD Fl G 6s 0, 1,,10 1, 2,,19,20 ONE PERIOD START STOP TECHNIQUES FOR TIMING A LIGHT OFF ON OFF START STOP

15 avcstl.ppt 05/2005Version 2.115 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS CHECKING A LIGHT'S FOCUS IN ORDER FOR A LIGHT TO BE CONSIDERED AS "WATCHING PROPERLY" – IT MUST BE LEVEL SO AS TO BE VISIBLE WITHIN THE VIEWING RANGE OF THE MARINER TOWER MOUNTINGS, AND A LEVELING PLATE WHICH ATTACHES THE LIGHT ASSEMBLY TO A TOWER OR OTHER STRUCTURE, ALLOW THE LIGHT'S HORIZONTAL POSITION TO BE ADJUSTED TO AN ACCEPTABLE "LEVEL" POSITION – WHICH IS DEFINED AS +/- 15 DEGREES FROM THE HORIZONTAL. AID VERIFICATION WORKSHEET QUESTION "FIXTURE LISTING OVER 15 DEGREES?" IS REALLY ASKING: – "IS THE LIGHT IN FOCUS AND/OR ARE ANY DAYBOARDS LEANING MORE THAN 15 DEGREES"? STRUCTURES (PILINGS, CELLS, CONCRETE PIERS, ETC.) MAY OFTEN BE LISTING AS MUCH AS 35 TO 40 DEGREES WHICH CANNOT BE FIXED WITHOUT TOTALLY REBUILDING THE AID – HOWEVER, THE LIGHT MAY BE "IN FOCUS" (AND "WATCHING PROPERLY") BY USING THE LEVELING PLATE OR BY ADJUSTING THE MOUNTING HARDWARE.

16 avcstl.ppt 05/2005Version 2.116 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS LIGHT IS IN PROPER FOCUS AND CAN BE SEEN UNOBSTRUCTED IN THE DIRECTION(S) AND FOR THE RANGE EXPECTED FLASHING LIGHTS ARE CONSIDERED TO BE "WATCHING PROPERLY" IF THE ACTUAL (TIMED) NUMBER OF SECONDS IS WITHIN PLUS OR MINUS THREE SECONDS INCLUSIVE (57.0 TO 63.0 SECONDS).  EXAMPLE: IF A LIGHT WITH PUBLISHED CHARACTERISTICS OF: Fl (2) R 6s ACTUALLY SHOWED TWENTY FLASHES IN 58.4 SECONDS, THE LIGHT WOULD BE CONSIDERED AS "WATCHING PROPERLY". WHEN IS A LIGHT CONSIDERED TO BE "WATCHING PROPERLY"

17 avcstl.ppt 05/2005Version 2.117 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS REPORTING PRIVATE AID VERIFICATIONS IN THE PREVIOUS EXAMPLE, THE LIGHT SHOWED: TWENTY FLASHES IN 58.4 SECONDS ALL WORKSHEETS HAVE FIELDS FOR ENTERING THE RESULTS: FLASHES IN SECONDS USE THE PREPRINTED FIELDS OR ENTER THE INFORMATION AS SHOWN ABOVE.

18 avcstl.ppt 05/2005Version 2.118 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS PREPRINTED PRIVATE AID WORKSHEETS HAVE FIELDS FOR ENTERING TIMING DATA. TIME EACH LIGHT AND RECORD THE RESULTS IN THE PROPER FIELDS ON THE WORKSHEET  EXAMPLE: " 20 FLASHES IN 58.4 SECONDS" IF YOU NEED TO IDENTIFY A SPECIFIC LIGHT FOR PRIVATE AIDS WITH MORE THAN ONE LIGHT  BEGIN WITH THE MOST U/S LIGHT AS #1 AND: REPORTING PRIVATE AID VERIFICATIONS Number of Lights Nomenclature for Light Identification /Location 2U/S, D/S 3U/S, MIDDLE, D/S 4MOST U/S, U/S, D/S, MOST D/S 5MOST U/S, U/S, MIDDLE, D/S, MOST D/S

19 avcstl.ppt 05/2005Version 2.119 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS IDENTIFYING SPECIFIC PRIVATE AID LIGHTS (EXAMPLE: FIVE-LIGHT FACILITY)  FOR THE MOST UPSTREAM LIGHT: – "MOST U/S = 10 Flashes in 59.4 Seconds", or – "#1 = 10 Flashes in 59.4 Seconds"  FOLLOWED BY: – "U/S = 10 Flashes in 61.3 Seconds", or – "#2 = 10 Flashes in 61.3 Seconds"  THEN: – "MIDDLE = 10 Flashes in 56.4 Seconds", or – "#3 = 10 Flashes in 56.4 Seconds"  AND: – "D/S = EXTINGUISHED", or – "#4 = EXTINGUISHED"  FINALLY: – "MOST D/S = 10 Flashes in 60.1 Seconds, Lamp Dim, Lens Cracked", or – "#5 = 10 Flashes in 60.1 Seconds, Lamp Dim, Lens Cracked" WHICH OF THE ABOVE EXAMPLES WOULD BE CONSIDERED AS "WATCHING PROPERLY"?

20 avcstl.ppt 05/2005Version 2.120 IF ANY TIMINGS ARE OUTSIDE THE TOLERANCE, CHECK “NO” AFTER THE ENTRY “ IS LAMP TIMING CORRECT? YES ( ) or NO ( ) ____________________ ”  OTHERWISE, IF CORRECT, CHECK THE “YES” “LAMP APPEARS TO BE ( ) GOOD, or ( ) DIM, or ( ) EXTENGUISHED REMARKS ________________”  IF A LIGHT IS EXTINGUISHED, CHECK “ ( ) Extinguished ” ON THE FORM AND INDICATE IF A LIGHT FIXTURE IS VISIBLE.  IF LIGHT IS GOOD, CHECK: “ ( ) Good ” ON THE FORM IF THE VERIFICATION OF AN AID SHOWS THAT ALL ASPECTS ARE IN GOOD SHAPE (NO DISCREPANCIES), THEN CHECK THE BOX “  “ ( ) WATCHING PROPERLY ” NEAR THE BOTTOM OF THE FORM. EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS REPORTING PRIVATE AID VERIFICATIONS

21 avcstl.ppt 05/2005Version 2.121 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS IF ANY DISCREPANCIES, SUCH AS EXTINGUISHED LIGHTS, ARE CONSIDERED "CRITICAL" THEY SHOULD BE REPORTED VIA VHF MARINE RADIO TO THE AOR GROUP. "URGENT" DISCREPANCIES SHOULD BE REPORTED VIA PHONE TO THE GROUP OR THE AOR CUTTER. – RECORD THE FACT THAT SUCH COMMUNICATION WAS MADE ON THE FORM IN THE SECTION: “CRITICAL ( ) or ( ) URGENT DISCREPANCY REPORTED VIA VHF ( ) or ( ) PHONE TO : __________________________” THE AID VERIFIER (AND ONLY THE AID VERIFIER) SHOULD PRINT THEIR NAME AND EMPL ID NUMBER AND SIGN THE WORKSHEET. THE DATE AND TIME IS ALWAYS THE DATE AND TIME OF THE INSPECTION. REPORTING PRIVATE AID VERIFICATIONS NOTE: PER D8(OAN) ALL EXTINGUISHED LIGHTS ON PRIVATE AIDS AND BRIDGES ARE CONSIDERED "CRITICAL" DISCREPANCIES AND SHOULD BE HANDLED IN THE SAME MANNER AS "CRITICAL" FEDERAL AIDS (LOCAL NOTICES TO MARINERS, TRACKING, RE-VERIFICATION, ETC.).

22 avcstl.ppt 05/2005Version 2.122 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS REPORTING THE RESULTS SUMMARY ACCURATE AND THOROUGH REPORTING REQUIRED – COAST GUARD PERSONNEL RECEIVING YOUR REPORTS ARE EXPECTED TO TAKE ACTION BASED ON THE DATA REPORTED – MAY INVOLVE CONTACTING OWNER OF AID OR BRIDGE TO GET DISCREPANCIES CORRECTED – BE VERY SPECIFIC IN DESCRIBING DISCREPANCIES AND THE LOCATION (FOR EXAMPLE, WHICH LIGHT) OF EACH DISCREPANCY – ATTACH PICTURE IF POSSIBLE AND APPROPRIATE NOTHING LESS THAN 100 PERCENT COMPLETE, DEFECT-FREE REPORTS ARE ACCEPTABLE

23 avcstl.ppt 05/2005Version 2.123 EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS I have the following comments regarding the Eighth Western Rivers Region Aid Verifier training presentation "Verifying a Light's Characteristics". Please indicate chart number. (attach copies of marked-up charts as appropriate): _________________________________________________________________________________________ Member Empl ID (Auxiliary): |___|___|___|--|___|___|--|___|___|--|___|___|___|___I___I___I___I Name: ____________________________________________________ Address: __________________________________________________ City: ____________________ State: ____ ZipCode: ______________ E-Mail: ___________________________________________________ INSTRUCTOR / STUDENT COMMENTS FORM Mail this form to: Michael “Mike” D. Stanley, DSO-NS 9539 22nd Street Perry, Kansas 66073-5056 Or E-Mail: mstanl1@juno.commstanl1@juno.com


Download ppt "Avcstl.ppt 05/2005Version 2.11 U.S.C.G. AUXILIARY EIGHTH WESTERN RIVERS REGION AID VERIFIER TRAINING VERIFYING A LIGHT'S CHARACTERISTICS Available on the."

Similar presentations


Ads by Google