Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ecosystem Planning Team Michael Perrone & Emily Alejandrino.

Similar presentations


Presentation on theme: "Ecosystem Planning Team Michael Perrone & Emily Alejandrino."— Presentation transcript:

1 Ecosystem Planning Team Michael Perrone & Emily Alejandrino

2  Constructed facilities replace lost goods and services  Cost of facilities = measure of ecosystem value  Include construction, land, O&M costs

3  Fish  Erosion control by floodplains  Clean water  Groundwater recharge

4  Fish hatcheries  Riprap on levees  Water treatment plants  Recharge basins

5  7 hatcheries for salmon and steelhead ◦ O&M = $7.3 million/year ◦ New hatchery = $10-30 million ◦ Today’s cost to build = up to $210 million


Download ppt "Ecosystem Planning Team Michael Perrone & Emily Alejandrino."

Similar presentations


Ads by Google