Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal.

Similar presentations


Presentation on theme: "Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal."— Presentation transcript:

1 Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal. 15 min.Paul Karchin 10 min.Mani Tripathi Readout Options: MINOS 15 min.Adam Para UC Davis Studies 15 min.Mani Tripathi Muon ID in b-b_bar events 15 min.Caroline Milstene

2 Prototype Module Layout 2.5m 5.0 m 43 full strips 3.6m (L) x 4.1cm (W) x 1cm (T) 43 short strips 3.6m => 0m long Read out: both ends of full strips; one end of short strips (except the shortest 22). 2*(43 + 21) fibers/side =128 channels = 8 (1.2mm dia) fibers/pix * 16(4 x 4mm 2 ) pixels => Equivalent of One MAPMT/prototype plane

3 How many prototype planes & strips? Each plane is the equivalent of 86 strips that are 3.6 m long. Each strip has a mass of 1.52 kg or 3.3 lbs. The weight of a plane (86 strips) is 131 kg or 288 lbs. Order 15% extra scintillator – 100 strips per plane or 330 lbs (152kg). 3 u & 3 v to over-constrain a straight line = 6 planes + one spare to use for resolving multi-hit ambiguities + one to learn the construction technique. => 8 planes. Total scintillator is 2,341 lbs (1.17T) or 700 strips or 1.064 Tonnes. Scintillator Cost - MINOS paid ~ $10/kg or $10K/tonne. Assume a 50% add’l cost for a small order: $16K

4 Fiber quantities and costs WLS Fiber Buy enough to instrument every strip: 100 strips*3.6m/strip = 360 m times 8 planes (one to learn on). => 2.88km Kuraray quote of $3.29m => $9,475 plus shipping & duty so add $1,500, which brings the total to: $11K WLS Clear Fiber From engineering drawing: Short near strips: 21*4.6 m = 97m Full strips: 43*(4.6m +2.3m) = 297m Short far strips: 21*4.3m = 90m Total 484m => 550m times 8 planes 4,400 m Clear cost = 4.4km*$3.11K/km = $13.7K +$1.5K = $15.2K Clear

5 Other fiber and layout costs (Mitch Wayne- Notre Dame) Polishing and splicing: Material costs – teflon tubes $3.0K Ice polishing + splicing: 32 hrs*$48/hr $1.5K Plastic sheets for fiber routes: $10/sqft: acrylic or $6/sqft: Lexan ($6-$10/sqft)*110sqft/sheet*8 sheets $5.3-9.0K Machining of plastic sheets: 20 hrs of programming*$40/hr = $0.8K 60 hrs Gerber routing*$40/hr = $2.4K Total machining of plastic sheets $3.2K

6 Multi-anode Photomultipliers 16 channel multi-anode PM 30mm Hamamatsu H6568 16 anode PM’s come in two varieties: w/ or w/o base. H8711-10 with base $1290.85 ea. for 6 or more. R7600-00-M16 w/o base $1011.37 ea. for 6 or more. We will need at least 14 MAPMTs for R&D: 8 for the 7 planes; 2 to replace two loaner tubes (spares); 4 for bench tests of electronics; Procure 7 w/bases; 7 w/o bases. Cost: $9,036 + $7,080 = $16,116

7 Incomplete R&D Cost Estimate


Download ppt "Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal."

Similar presentations


Ads by Google