Presentation is loading. Please wait.

Presentation is loading. Please wait.

PWE3 Agenda – Monday 8 th Nov 15 min - Agenda bash, WG Agenda and Status - Andy Malis and Matthew Bocci 5 min - Dynamic Placement of Multi Segment Pseudo.

Similar presentations


Presentation on theme: "PWE3 Agenda – Monday 8 th Nov 15 min - Agenda bash, WG Agenda and Status - Andy Malis and Matthew Bocci 5 min - Dynamic Placement of Multi Segment Pseudo."— Presentation transcript:

1 PWE3 Agenda – Monday 8 th Nov 15 min - Agenda bash, WG Agenda and Status - Andy Malis and Matthew Bocci 5 min - Dynamic Placement of Multi Segment Pseudo Wires - Luca Martini http://tools.ietf.org/html/draft-ietf-pwe3-dynamic-ms-pw-13.txt 5 min - Inter-Chassis Communication Protocol for L2VPN PE Redundancy - Luca Martini http://tools.ietf.org/html/draft-ietf-pwe3-iccp-04.txt 10 min - Pseudowire Status for Static Pseudowires - Luca Martini http://tools.ietf.org/html/draft-ietf-pwe3-static-pw-status-01.txt 10 min - Pseudowire Control Word Negotiation Mechanism Analysis and Update - Lizhong Jin http://tools.ietf.org/html/draft-jin-pwe3-cbit-negotiation-01 15 min - Mandatory Features of Virtual Circuit Connectivity Verification Implementations - Nick DelRegno http://tools.ietf.org/html/draft-delregno-pwe3-vccv-mandatory-features-02.txt

2 PWE3 Agenda – Monday 8th Nov 10 min - Mandatory Use of Control Word for PWE3 Encapsulations - Nick DelRegno http://tools.ietf.org/html/draft-delregno-pwe3-mandatory-control-word-00 10 min - Encapsulation Methods for Transport of Packets over an MPLS PSN - efficient for IP/MPLS - Sriganesh Kini http://tools.ietf.org/html/draft-kini-pwe3-pkt-encap-efficient-ip-mpls-01.txt 10 min - Pseudowire Virtual Circuit Connectivity Verification (VCCV): An Inband Control Channel using offset - Sriganesh Kini http://tools.ietf.org/html/draft-kini-pwe3-inband-cc-offset-00.txt 10 min - LDP extensions for Explicit Pseudowire to transport LSP mapping - Mach Chen http://tools.ietf.org/html/draft-cao-pwe3-mpls-tp-pw-over-bidir-lsp-01.txt 5 min - Signaling Root-Initiated Point-to-Multipoint Pseudowires using LDP - Luca Martini http://tools.ietf.org/html/draft-martini-pwe3-p2mp-pw-01.txt 15 min - Using the Generic Associated Channel Label for Pseudowire in MPLS-TP - Luca Martini http://tools.ietf.org/html/draft-lm-pwe3-mpls-tp-gal-in-pw-00.txt

3 PWE3 Agenda – Monday 8th Nov 10 - min - LDP Extensions for Pseudo Wire (PW) Transfer in an MPLS-TP Network - Yuanlin Bao http://tools.ietf.org/html/draft-bao-pwe3-pw-transfer-00.txt 5 min - LDP Extensions for Proactive OAM Configuration of Dynamic MPLS-TP PW - Fei Zhang http://tools.ietf.org/html/draft-zhang-mpls-tp-pw-oam-config-03 5 min - Stitching Procedures for Static PW in MPLS-TP Environment - Sami Boutros http://tools.ietf.org/html/draft-boutros-pwe3-mpls-tp-ms-pw-00

4 PWE3 WG Status IETF-79 Andy Malis andrew.g.malis@verizon.comandrew.g.malis@verizon.com Matthew Bocci Matthew.Bocci@alcatel-lucent.comMatthew.Bocci@alcatel-lucent.com

5 Goals and Milestones: Need Updating! Done - PWE3 WG started, organize editing teams. Done - Hold interim meeting, including discussion of priority of service-specific documents and consider pruning some deliverables Done - Accept drafts of service-specific documents as WG items Done - PW Requirements Document Last Call Done - TDM Circuit Documents Last Call Done - ATM Documents Last Call Done - Ethernet Documents Last Call Done - Fragmentation LC Done - TDM Requirements LC Done - SONET Documents Last Call Done - TDM Documents Last Call Done - Frame Relay Documents Last Call Done - FCS retention Last Call Done - Multi-Segment PW Requirements LC Done - VCCV LC Done - PWE3 Services MIBs LC Done - PPP/HDLC PW LC Done - Wildcard FEC LC Done - TDM Signaling LC Jul 2008 - Multi-Segment Architecture LC Done - Basic Pseudowire MIBs LC Sep 2008 - Fiber Channel Encap LC Sep 2008 - PW OAM Mapping LC Sep 2008 - Congestion Framework LC Oct 2008 - Multi-Segment PW LC Dec 2008 - PW Protection and Restoration Requirements LC Dec 2008 - PW Congestion Response LC Dec 2008 - Generic PW Requirements Jan 2009 - Dynamic MS PW LC Mar 2009 - PW Protection and Restoration Architecture Mar 2009 - Multipath PW LC Mar 2009 - Generic Associated Channel Header LC Apr 2009 - MPLS PW LC Jul 2009 - PW Protection and Restoration LC Jul 2009 - Multisegment PW MIB Jul 2009 - Congestion Solution LC Jul 2009 - Security Considerations LC Jul 2009 - P2MP Requirements LC Dec 2009 - Enhanced PW OAM Dec 2009 - VCCV Extensions for MPLS-TP Dec 2009 - Tandem Connection Monitoring for PWs

6 Document Status 1 New RFCs since last IETF: RFC5994 – Application of Ethernet Pseudowires to MPLS Transport Networks draft-ietf-pwe3-segmented-pw RFC Ed Queue Currently awaiting resolution of a terminology issue around the S-PE TLV

7 Document Status 2 draft-ietf-pwe3-cep-mib IESG Evaluation::AD Followup draft-ietf-pwe3-p2mp-pw-requirements AD Watching: Awaiting shepherd’s review Went though WG LC, but likely to need editorial work before progressing to IESG draft-ietf-pwe3-fat-pw Comments were received during last call New ID just published. Will be sent to IESG imminently.

8 Document Status 3 draft-ietf-pwe3-oam-msg-map Publication requested following WG LC With Stewart draft-ietf-pwe3-mpls-eth-oam-iwk Working group last call after Beijing IETF draft-ietf-pwe3-fc-encap Working group last call after Beijing IETF draft-ietf-pwe3-iccp On-agenda

9 Document Status 4 draft-ietf-pwe3-dynamic-ms-pw –On agenda –Waiting for Segmented PW before progressing draft-ietf-pwe3-ldp-aii-reachability –Waiting for Dynamic MS-PW draft-lm-pwe3-mpls-tp-gal-in-pw –To be: draft-ietf-pwe3-mpls-tp-gal-in-pw On agenda

10 Document Status 5 PW redundancy drafts: draft-ietf-pwe3-redundancy draft-ietf-pwe3-redundancy-bit - Completed last call - Authors need to address comments - draft-ietf-pwe3-p2mp-pw - On-going - draft-ietf-pwe3-static-pw-status - On agenda


Download ppt "PWE3 Agenda – Monday 8 th Nov 15 min - Agenda bash, WG Agenda and Status - Andy Malis and Matthew Bocci 5 min - Dynamic Placement of Multi Segment Pseudo."

Similar presentations


Ads by Google