Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify.

Similar presentations


Presentation on theme: "Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify."— Presentation transcript:

1 Pending changes to mod 500 WG(6) – CAM-CMP

2 Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify within day quantity rule for kWh/h:  Registered (kWh/d) = Successful bid (kWh/h) x hrs remaining in day  3.2.7) reworded - paragraph about JBP communications  Add in that CMP quantities will be published (on UK Link) before each long term auction  Suspend ad-hoc increases for Oct 2015 (IPs only)  Added the default bid rule the for first small price step round. 2

3 Updates Continued - Contingency  In the event of a PRISMA outage the Overruns will be suspended at IPs if the duration of the outage last for either:  6 consecutive within day auctions, at any point for a gas day  4 consecutive within day auctions, if the outage starts at 19:00 or later  (NG view that if PRISMA develops a contingency process then the enhanced overrun suspension rules for IPs will need to be reviewed). 3

4 Updates Continued - Transition  Auctions will commence on 31 st Oct 2015 but other capacity processes can/will be available earlier than this.  An ‘Operational Start Date’ will be added into the transition rules in the mod. On this date then the following processes will be ready and available.  PRISMA Registration  CMP Surrender  Secondary Trading  Voluntary Bundling  Date of Operational Start Date will be communicated nearer the time (but before 1 st Nov 2015).  Dependencies: Bacton Splitting and PRISMA kWh/d functionality 4

5 Legal Text WG(6) – CAM-CMP

6 Section S – Charge items (Entry)  1.1 NTS Entry Capacity - Interconnection Point Charges  (a) IP Charges in respect of Annual NTS Entry Capacity;  (b) IP Charges in respect of Monthly NTS Entry Capacity;  (c) IP Charges in respect of Daily NTS Entry Capacity;  (d) IP Charges in respect of Interruptible Daily NTS Entry Capacity;  (e) IP Entry CMP Surrender; and  (f) IP Entry LTUIOLI 6

7 Section S – Charge Items (Exit)  2.1 NTS Exit Capacity - Interconnection Point Charges  (a) IP Charges in respect of Annual NTS Exit Capacity;  (b) IP Charges in respect of Monthly NTS Exit Capacity;  (c) IP Charges in respect of Daily NTS Exit Capacity;  (d) IP Charges in respect of Interruptible Daily NTS Exit Capacity;  (e) IP Exit CMP Surrender; and  (f) IP Exit LTUIOLI 7

8 Section Y  See separate doc 8

9 Next Steps - 500  Updated mod + legal text released at least 5 business days before next WG (5 th Nov).  Please review, and feedback any concerns to NG before next WG.  All being well - complete DMR on 5 th Nov.  This is in time for November panel 9


Download ppt "Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify."

Similar presentations


Ads by Google