Presentation is loading. Please wait.

Presentation is loading. Please wait.

PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.

Similar presentations


Presentation on theme: "PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13."— Presentation transcript:

1 PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13

2 Preparations continue Tuning up the trigger system Check out subsystem monitoring Prepare the fast-production system With beam, system checks and full-detector runs No beam: calibrations (IR access when available) On Friday, move the Silicon detectors in from the retracted position. 2Hubert van Hecke - 05 Mar 13

3 Criteria for start-of-physics 109 bunches in the machine Longitudinal polarization established, <5% transverse component >=55% polarization at the start of the store Beta* = 0.65 >1*10 11 protons/bunch 3Hubert van Hecke - 05 Mar 13


Download ppt "PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13."

Similar presentations


Ads by Google