Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Similar presentations


Presentation on theme: "Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power."— Presentation transcript:

1 Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power Company Limited (OTPC) at Pallatana, Tripura 1

2 Power Allocation S. No.BeneficiariesAllocation (MW) 1Tripura196 2Assam240 3Arunachal Pradesh22 4Nagaland27 5Mizoram22 6Manipur42 7Meghalaya79 8IL&FS / OTPC98 Total726 * Note: 50% of allocation is assumed to be linked with Unit -1 2

3 3

4 Power Evacuation System Required by December 2011 along with Unit-1 (363.3 MW). A.Group -1 i.Pallatana Switchyard - OTPC ii.Pallatana - Silchar T/L – NETC iii.Silchar sub-station – POWERGRID B. Group -2 i.Pallatana- Surajmani Nagar T/L – POWERGRID ii.Surajmani Nagar sub-station – TSECL C Group -3 i.Silchar – Hailakandi T/L – POWERGRID ii.Hailakandi sub-station – AEGCL D Group -4 i.Silchar- Srikona T/L- POWERGRID ii.Srikona sub-station – AEGCL E Group - 5 i.Silchar- PK Bari T/L – POWERGRID ii.PK Bari sub-station – TSECL 4

5 Power Evacuation System (Continued) F. Group - 6 i.Silchar- Imphal T/L – POWERGRID ii.Imphal (new)sub-station – POWERGRID G.Group – 7 – POWERGRID i.Silchar – Melriat T/L ii. Melriat (new)sub-station H.Group – 8 – POWERGRID i.Passighat- Roing – Tezu- Namsai T/L ii.Roing sub-station iii.Tezu sub-station iv.Namsai sub-station I. Group- 9 – POWERGRID i.LILO of Kathalguri – Misa T/L at Mariani (new) ii.Mariani (new) – sub-station iii.Mariani (new) – Mokochung T/L iv.Mokochung sub-station v.Mokochung (POWERGRID) – Mokochung (Nagaland) T/L 5

6 Evacuation System with Unit – 1 6

7 Evacuation System with Unit -1 (Continued ) 7

8 Power Evacuation System (Continued) Required by March 2012 along with Unit-2 (363.3 MW). A.Group -1 i.Silchar – Bongaigaon T/L - NETC ii.Bongaigaon sub-station – POWERGRID B. Group -2 i.LILO of Silcahr –Bongaigaon line at Byrnihat sub-station – MeECL ii.Byrnihat sub-station – MeECL C. Group -3 i.LILO of Silcahr –Bongaigaon line at Azara – AEGCL ii.Azara sub-station – AEGCL 8

9 Evacuation System with Unit –II 9