1 CYBER Display Intelligent Energy Europe - Project N. IEE-07-769 23° September 2007, Bristol Marco Caponigro Project part financed by the European Union.

Similar presentations


Presentation on theme: "1 CYBER Display Intelligent Energy Europe - Project N. IEE-07-769 23° September 2007, Bristol Marco Caponigro Project part financed by the European Union."— Presentation transcript:

1 1 CYBER Display Intelligent Energy Europe - Project N. IEE-07-769 23° September 2007, Bristol Marco Caponigro Project part financed by the European Union Municipality of Salerno Municipality of Udine A survey on the implementation of the energy performance in buildings in Italy

2 2 / 7 The Italian Partners  The Municipality of Salerno  South West Italy  140.580 inhabitans (Urban area inhabitans )  17.325,32 as GDP per capita (EU average 22.600 EURO)  New urban plan investments from the 1993 with an increasing attention to energy

3 3 / 7 The Italian Partners  The Municipality of Udine  North East Italy  97.880 inhabitans  28.184,24 EURO as GDP per capita  Long tradition in environment policy making

4 4 / 7 Energy performance a long history  Law n. 10/91 “Measures on energy” and decree 380/01 “General regulation on buildings”  Energy certification  Performance and maintenance of thermal plant  Control and inspections of thermal plants  Legislative decree n. 192/2005 implementation of the Directive 91/2002  Legislative decree n. 311/2006 integration to the former decree

5 5 / 7 The Implementation of the Directive  Main points  General criteria for calculation methodology  General criteria for certification  heating or cooling plants performance & maintenance  Criteria for the next guidelines  Collection of data and monitoring  State of the art  To be issued general guidelines on: professional requirements and accreditation of experts energy performance of public and supported buildings detailed energy performance calculation  Many Regional Authorities issued their own regulation

6 6 / 7 The Implementation of the Directive  Implementation period  energy declaration  1° January 2007 for Public buildings and for accession to grant  Obbligation for trading and renting 1° July 2007 – building > 1000 mq 1° July 2008 – building < 1000 mq 1° July 2009 – all  Main requirements for the elaboration of the energy consumption buildings are based on Thermal plants (essentially) Cooling and heating Use of RES

7 7 / 7 The Implementation of the Directive  Institutions involved  Ministry of economic devolpment  Ministry of Environment  Regional and local Authority  ENEA – National Agency  Education and university system  Operators involved  Building constructor  Professionals  Energy manager  Users  Other stakeholder  GME – manager of electric market  AEEG - Authority  GSE – manager of electric system

8 8 / 7 Energy performance a step in a wide strategy  Liberalization of the market (privatization, unboundling)  Financial incentives  Fiscal for building works (up to 55%)  Grants for solar plants  Structural fund  White certificate  Green certificate  Energy efficiency NAAP (dir.32/06) – 1% per year (main of the save from the buildings)

9 9 / 7 Marco Caponigro Energy economist tel.: + 39 333 2449483 marcocaponigro@tiscali.it Thank you for your attention…