Presentation is loading. Please wait.

Presentation is loading. Please wait.

MARUTI VIHAR SARBOJONIN DURGOTSAV 2015 Celebration…

Similar presentations


Presentation on theme: "MARUTI VIHAR SARBOJONIN DURGOTSAV 2015 Celebration…"— Presentation transcript:

1 MARUTI VIHAR SARBOJONIN DURGOTSAV 2015 Celebration…

2

3

4

5

6 MVSD has already invited many more eminent Journalists, Cabinet Secretaries, Heads of NGOs who are working for the cause of “Save The Girl Child”, Leaders of Indian Army and Many more eminent persons for the Talk Show based on our theme.

7

8 MVSD wishes to make this the Theme for Durga Puja 2015, for it’s Importance and Social Relevance Today Poverty Gender Discrim ination Lack of Education Traditio nal Practices Future Specula tions

9 Shri Majumdar being felicitated by Hon CM, Haryana, Shri Bhupinder Singh Hooda in 2014 Terracota Gate at Surajkund, Faridabad Artist, Designer & Sculptor

10 * Image for illustrative purpose only MVSD wishes to make this the Theme for Durga Puja 2015, for it’s Importance and Social Relevance Today First Time in Gurgaon to spread the awareness among 5-7 lacs visitor visually A Theme Depiction requires an intricate Design concept. All aspects of the Pandal, Lighting, Interior Design, Ambience, Sound and Crowd Movement need to be synchronized to reflect the Theme. This is a very challenging assignment as such a Theme Puja has never been attempted in Gurgaon

11 Part 2 (5 Days of Puja) Theme – based decoration and idol Expected footfalls of 5-7 Lacs Branding Opportunities in the Pandal Part 1 (Pre Puja Promotion) 1 Month On Air (Radio) On Ground pre promotion events like Run for India, Let Her Live Outdoors & Digital Promotions

12 Radio Print Outdoor On Ground Awareness & Consumer Engagement Ads in leading Newspapers & Souvenir Ads Branding options On Gates, Stalls & Pandal Publicity through media presence 5-7 Lac Footfalls & Inter-University Competitions On Puja Theme

13

14 September 2015 October 2015 JulyAugustWeek 2Week 3Week 4 Days (18/10 to 22/10) RADIO PRINT OUTDOOR Pre Event Promotion

15

16 Glimpse of Event Glimpse of Media Coverage

17

18 Sponsor Logo On Standee during the On Ground competition at the Venue Sponsor On Air tags Sponsor Logo On Standee during the On Ground competition at the Venue Sponsor On Air tags

19 Sponsor Logos in Outdoor Hoardings

20 PublicationSizeRate/sq. cm. HT Gurgaon Main33.2 X 52 - Full Page595 HT Gurgaon City33.2 X 52 - Full Page325 HT Gurgaon Main33.2 X 25 -Half Page650 HT Gurgaon City33.2 X 25 -Half Page325 HT Gurgaon City33.2 X 25 -Half Page325 HT Gurgaon Main33.2 X 25 -Half Page650 HT Gurgaon City25 X 16 - Quarter Page325 HT Gurgaon Main25 X 16 - Quarter Page595 Print ads in HT Sponsor Logos in Print advertisement

21 Exclusive Sponsor Branding like Gates, Banners, Hoardings, Balloon, Stalls, Pillars etc On Air Promo Tags Exclusive Sponsor Branding like Gates, Banners, Hoardings, Balloon, Stalls, Pillars etc On Air Promo Tags

22 Panchami-18 th Oct Sasthi -19 th Oct Saptami -20 th Oct Asthami -21 st Oct Nabami -22 nd Oct Exclusive Sponsor Branding like Gates, Banners, Hoardings, Balloon, Stalls, Pillars etc On Air Promo Tags Exclusive Sponsor Branding like Gates, Banners, Hoardings, Balloon, Stalls, Pillars etc On Air Promo Tags

23 Exclusive Sponsor Branding like Banners, Hoardings, etc

24 SR.NO. DELIVERABLESPRESENTING(1 No.)Powered by(1 No.) ASSOCIATE(4/5 Nos.) A RADIO Promos5 Sec Extended Mention + Tag 3 Sec Brand Mention Brand Mention Mentions Extended MentionBrand Mention- BPRINT Composite Logo + Tag (1000 SQCM Assured) Composite Logo (500 SQCM Assured) Foundation Logo Strip (Min. Assured) - As per Media Plan COUTDOOR - 500 Sq. Ft Composite Logo + Tag Composite LogoFoundation Logo Strip

25 DON GROUND ( At the Pandal)PRESENTING(1 No.)Powered by (1 No.)ASSOCIATE(4/5 Nos.) Super premium Gate in MG Road ( 10 lac Viewrship in a day) Composite Logo Composite Logo + Tag Premium Gate (Entry & exit gates) - 2 Nos Composite Logo + Tag Composite Logo Foundation Logo Strip 4 Sided Pillar Branding - 4 No's4 sided 4 pillar4 sided two pillar4 sided 1 pillar *Cost of branding to be borne by the client Hoardings Composite Logo + Tag C Cat (10 x 20)4 Nos2 Nos D Cat (10 x 10)2 Nos 3 Nos * Printing, mounting costs to be borne by the client Lamp Post Branding Composite Logo + TagComposite LogoFoundation Logo Strip (Size : 6 x 1.5 ft)6 nos4 nos3 nos Banners Composite Logo + TagComposite LogoFoundation Logo Strip (Size: 6 x 4 ) -10 Nos8 Nos5 Nos Stalls (10 x 10)210 *Cost of branding to be borne by the client Back Drop of Cultural Stage Branding Composite Logo + TagComposite LogoFoundation Logo Strip *Cost of branding to be borne by the client Baloon of Cultural Stage Branding Composite Logo + TagComposite Logo *Cost of branding to be borne by the client

26 PRESENTINGPOWERED BY/ INITIATIVEPOWERED BY/ INITIATIVE ASSOCIATES ASSOCIATES INR 12 LacINR 12 LacINR 8 LacINR 8 LacINR 6 LacINR 6 Lac

27


Download ppt "MARUTI VIHAR SARBOJONIN DURGOTSAV 2015 Celebration…"

Similar presentations


Ads by Google