Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL.

Similar presentations


Presentation on theme: "March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL."— Presentation transcript:

1 March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL

2 March 13, 2002 Daniel Whiteson Single muon trigger Triggers mu1ptx{a,b,c,w}txx are prescaled by 20 and are very impure (~5%) An improvement in rejection could increase the physics bandwidth for real muons (find more W ’s!)

3 March 13, 2002 Daniel Whiteson Can we find muon tracks? GTR L3Global Tracker Propagate tracks to the muon A-layer, look for match in dr = local distance in plane of A-layer

4 March 13, 2002 Daniel Whiteson Track spectrum - run 147475 We need to look at the Pt spectrum of the leading tracks Events with no track found Rejection Factor = 1/(1-%remaining)

5 March 13, 2002 Daniel Whiteson Efficiency & Rejection Rejection Factor from leading track Event Efficiency on sample of tight offline  with pt>3.0 At 50% efficiency, rejection of ~20 CFT Tracking with 8 hits required

6 March 13, 2002 Daniel Whiteson Parameter Comparison

7 March 13, 2002 Daniel Whiteson L3-GTR track matching Using offline geometry database Number of SMT hits jumps!


Download ppt "March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL."

Similar presentations


Ads by Google