Presentation is loading. Please wait.

Presentation is loading. Please wait.

110-10-26 Beta Prototype Sarah Kuria. 210-10-26 Overview Project Schedule Important Events Process Related Information Other Experiences Demonstration.

Similar presentations


Presentation on theme: "110-10-26 Beta Prototype Sarah Kuria. 210-10-26 Overview Project Schedule Important Events Process Related Information Other Experiences Demonstration."— Presentation transcript:

1 110-10-26 Beta Prototype Sarah Kuria

2 210-10-26 Overview Project Schedule Important Events Process Related Information Other Experiences Demonstration

3 310-10-26 Project Schedule Current State Advances Since Alpha General State of the Project Overview of Problems Achievements

4 410-10-26 Project Schedule: Current State

5 Project Schedule: Advances Since Alpha 10-10-26

6 Project Schedule: General State of the Project Cost: 666 man-hours –864predicted –1440 planned project cost –1242 new forecast 10-10-26

7 Project Schedule: Overview of Problems and Achievements –A better understanding of Eclipse Architecture –Alpha release –Combine the Diagramming and Programming Views in a single Perspective –The Debugger framework is vast and complex and there is little support for its functionality –Creating an Interpreter for the student’s assembly. 10-10-26

8 8 Important Events Requirements Modifications Customer Meetings

9 910-10-26 Process Related Information PROMISEDesigner View –Assembler Graphical Architecture using drag and drop –Connect, Resize, Edit Graphical components –Edit graphical parts, add descriptions –File Manipulation (Creation, Edit, Save) –Define a custom Assembler Grammar

10 1010-10-26 Process Related Information PROMISEStudent view –Accept and Save, Code, Input, Edit, Save –Code parsing, syntax highlights, auto- complete –Code Compilation and Debugging –Stepping through code, adding break- points –Visual Code Run

11 1110-10-26 Process Related Information PLAN –Program Analysis Definition –Program Development –Program Testing

12 1210-10-26 Process Related Information PROGRESS –New technologies –Refined the UI versions –Making some headway with the debugger SETBACKS –Schedule –Accessing in-built functionality

13 Other Experiences Negative –Unstable versions of Eclipse –Incomplete or wrong Tutorials Positive –Eagerness to learn –Visible results Unanticipated risks –Features –Tutorials 10-10-26

14 Other Experiences Work Distribution Communication Distributed Collaboration Cultural Issues 10-10-26

15 1510-10-26 and now…. the demonstration.………….

16 1610-10-26


Download ppt "110-10-26 Beta Prototype Sarah Kuria. 210-10-26 Overview Project Schedule Important Events Process Related Information Other Experiences Demonstration."

Similar presentations


Ads by Google