Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Army Reserve DAAR-FD, 2 July 2002,1 ARMY RESERVE IMPLEMENTATION PLAN Amry Watercraft Restructuring Plan (AWRP) VTC 2 July 2002 Pentagon.

Similar presentations


Presentation on theme: "The Army Reserve DAAR-FD, 2 July 2002,1 ARMY RESERVE IMPLEMENTATION PLAN Amry Watercraft Restructuring Plan (AWRP) VTC 2 July 2002 Pentagon."— Presentation transcript:

1 The Army Reserve DAAR-FD, 2 July 2002,1 ARMY RESERVE IMPLEMENTATION PLAN Amry Watercraft Restructuring Plan (AWRP) VTC 2 July 2002 Pentagon

2 The Army Reserve DAAR-FD, 2 July 2002,2 ARMY RESERVE IMPLEMENTATION PLAN AGENDA ARMY RESERVE AWRP POSITION MILESTONES/TIMELINES ISSUES

3 The Army Reserve DAAR-FD, 2 July 2002,3 ARMY RESERVE IMPLEMENTATION PLAN ARMY RESERVE AWRP POSITION – Support Army PREPO IAW DOD Directive 1225.6 – PREPO Endstate – Transfer Vessels to AMC – Crew to Boat Ratio 2:1, 10 Crews - 5 Boats MULTI-COMPO – Execute DA Plan as Ordered. Waiting Decision on the 332 nd Terminal Bn Staying Multi-Compo (M-C) FUTURE – Will Re-evaluate Army Reserve Watercraft Position in TAA 11

4 The Army Reserve DAAR-FD, 2 July 2002,4 ARMY RESERVE IMPLEMENTATION PLAN MILESTONES/TIMELINES 175 th TC Co (Floating Craft Maintenance), Tacoma, WA – Converts to Watercraft Maint Co, Edate 20030916 467 th TC Co (Floating Craft), Tacoma, WA – Converts to Modular Causeway, M-C, New Proposed Edate 20040916 – Fielding of MCS sets (Warping Tug slipped from Nov 02 to Mar 03) 203 rd Trans Det (LSV #8), Baltimore, MD – No funding for LSV#8 – Carrier Edate 20050916

5 The Army Reserve DAAR-FD, 2 July 2002,5 ARMY RESERVE IMPLEMENTATION PLAN MILESTONES/TIMELINES 548 th Trans Det (LSV #7), Honolulu, HI – Under Construction, Fielding Nov 03 – Edate 20020916 805 th Trans Det (LSV #3), Tacoma, WA – Mobilized in Support of ONE/OEF, 26 Mar 02 464 th TC Co (Medium Boat), Ft. Belvoir, VA – Inactivate (J) 20030915

6 The Army Reserve DAAR-FD, 2 July 2002,6 ARMY RESERVE IMPLEMENTATION PLAN MILESTONES/TIMELINES 949 th TC Co (Floating Craft), Baltimore, MD – Converts to M-C Floating Craft. Edate 20030916 481 st TC Co (Heavy Boat), Mare Island, CA – Convert to M-C 20030916

7 The Army Reserve DAAR-FD, 2 July 2002,7 ARMY RESERVE IMPLEMENTATION PLAN MILESTONES/TIMELINE 824 th TC Co (Heavy Boat), Morehead City, NC & Tampa, FL – Edate to MC 20020917 332 nd TC Terminal Bn, Tampa, FL – Edate to MC 20020917, awaiting decision DA on MC

8 The Army Reserve DAAR-FD, 2 July 2002,8 ARMY RESERVE IMPLEMENTATION PLAN ISSUES 332 nd TC Terminal Bn M-C Status Equipment Funding/Timeline - Logistic Support Vessel - Theater support Vessel - Modular Causeway System - Vessel Bridge Simulator (Maintenance, etc POM) - Containerized Maintenance Facility (CMF) DOD Directive 1225.6 (New and/or Combat Serviceable Equipment for Reserve Forces) Replacement Plan - Vessel to Crew Ratio, OCAR position remains 2:1 in support of the Army Position

9 The Army Reserve DAAR-FD, 2 July 2002,9 ARMY RESERVE IMPLEMENTATION PLAN QUESTIONS ?


Download ppt "The Army Reserve DAAR-FD, 2 July 2002,1 ARMY RESERVE IMPLEMENTATION PLAN Amry Watercraft Restructuring Plan (AWRP) VTC 2 July 2002 Pentagon."

Similar presentations


Ads by Google