Presentation is loading. Please wait.

Presentation is loading. Please wait.

Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL.

Similar presentations


Presentation on theme: "Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL."— Presentation transcript:

1 Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL

2 Insert Date Revision 0 Page 2 MAIN COMPONENTS LUGS PROBE CONVERSION MODULE

3 Insert Date Revision 0 Page 3 Route fiber similar to existing wiring 2 Connect fiber to Conversion Module 3 Mount lug at location of interest 1 SIMPLE 3 STEP INSTALLATION

4 Insert Date Revision 0 Page 4 1 - LUG INSTALLATION

5 Insert Date Revision 0 Page 5 2 – ROUTE FIBER

6 Insert Date Revision 0 Page 6 3 – CUT AND CONNECT FIBER TO MODULE

7 Insert Date Revision 0 Page 7 DATA DOWNLOAD (SCADA OR USB) DIRECT FROM SCADA THROUGH USB

8 Insert Date Revision 0 Page 8 MEDIUM VOLTAGE SWITCHGEAR

9 Insert Date Revision 0 Page 9 LOW VOLTAGE SWITCHGEAR

10 Insert Date Revision 0 Page 10 APPLICATION EXAMPLES


Download ppt "Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL."

Similar presentations


Ads by Google