Download presentation
Presentation is loading. Please wait.
Published byGiles Hutchinson Modified over 9 years ago
1
Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL
2
Insert Date Revision 0 Page 2 MAIN COMPONENTS LUGS PROBE CONVERSION MODULE
3
Insert Date Revision 0 Page 3 Route fiber similar to existing wiring 2 Connect fiber to Conversion Module 3 Mount lug at location of interest 1 SIMPLE 3 STEP INSTALLATION
4
Insert Date Revision 0 Page 4 1 - LUG INSTALLATION
5
Insert Date Revision 0 Page 5 2 – ROUTE FIBER
6
Insert Date Revision 0 Page 6 3 – CUT AND CONNECT FIBER TO MODULE
7
Insert Date Revision 0 Page 7 DATA DOWNLOAD (SCADA OR USB) DIRECT FROM SCADA THROUGH USB
8
Insert Date Revision 0 Page 8 MEDIUM VOLTAGE SWITCHGEAR
9
Insert Date Revision 0 Page 9 LOW VOLTAGE SWITCHGEAR
10
Insert Date Revision 0 Page 10 APPLICATION EXAMPLES
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.