Presentation is loading. Please wait.

Presentation is loading. Please wait.

Industrial System Natural System Industrial System.

Similar presentations


Presentation on theme: "Industrial System Natural System Industrial System."— Presentation transcript:

1 Industrial System Natural System Industrial System

2 Energy

3 LimitedResources LimitedWaste

4 Highway Transportation Engineering Transportation Engineering Planning Operation / Control Design Pavement Materials Operation Design Planning

5 Use of Petroleum Cost Increase / Limited Resource Economic Insecurity / Energy Vulnerability High # of Users Congestion Transportation System User Cost Roadway Infrastructure High Demand/High Exposure to wear & tear / Construction/ Maintenance & Repair Cost Auto Dependency

6 STEP I Set the Project Type/Level Identify Project Phase Establish Project Context STEP II Generate Project Credit Checklist Per category – water, site, energy, material, operation and maintenance etc Required and Recommended checklist STEP III Project Achievement Score and Evaluate STEP IV Certificate Platinum, Gold, silver, Bronze etc

7

8 State Wide Planning - Cooperative, continuous and comprehensive planning process - Administered jointly by FHWA & FTA - STIP Requirements - Long Range Transportation Plan requires coordination with tribal and local agencies - Responsible for implementing the projects approved in the MPO, RPO transportation plan and TIP MPO - Responsible for planning, programming and coordination of federal highway and transit investments in metropolitan areas - Include multi-jurisdictional governing boards made up of local elected officials, tribes, state DOTS, transit providers and other transportation related organizations and entities - Responsible for overall coordination in planning and programming funds for projects and operations RPO - Responsible in areas outside of metropolitan areas - Provide a forum for local input on transportation issues impacting non-metropolitan communities with a population below 50,000 - Responsible for overall coordination in planning and programming funds for projects and operations Federal regulations spell out the role of MPOs and RPOs

9 STEP I Area-Wide Planning and Programming STEP II Project Development STEP III Project Implementation STEP IV Operation and Maintenance


Download ppt "Industrial System Natural System Industrial System."

Similar presentations


Ads by Google