Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tools to help complete “Height Mod” Surveys OPUS & OPUS Projects Joe Evjen, Geodesist, NGS Height Modernization Eastern States Regional Tuesday, March.

Similar presentations


Presentation on theme: "Tools to help complete “Height Mod” Surveys OPUS & OPUS Projects Joe Evjen, Geodesist, NGS Height Modernization Eastern States Regional Tuesday, March."— Presentation transcript:

1 Tools to help complete “Height Mod” Surveys OPUS & OPUS Projects Joe Evjen, Geodesist, NGS Height Modernization Eastern States Regional Tuesday, March 04, 2014 Webinar

2 options: projects & publishing your solution mark description IGS & NGS base stations & site information files IGS antenna calibrations & satellite orbits & reference frames UNAVCO teqc converter PAGES baseline processor var. geophysical models NGS geodetic toolkit IGS & NGS base stations & site information files IGS antenna calibrations & satellite orbits & reference frames UNAVCO teqc converter PAGES baseline processor var. geophysical models NGS geodetic toolkit your GPS data standard geodetic data OPUS O nline P ositioning U ser S ervice JGE 2013 v1 free, fast, easy, consistent coordinates geodesy.noaa.gov/OPUS

3 Static: OPUS determines your position with a differential GPS static solution, using hours of data. This process is repeated 4x from other CORS. baseline 1 baseline 3 baseline 4 baseline 2 baseline 5 NO BENCH MARKS … is this a height mod survey?

4 OPUS report From: opus Subject: OPUS solution : nji20010.10o.txt OP1377187607298 NGS OPUS SOLUTION REPORT ========================... SOFTWARE: page5 1209.04 master43.pl 072313 START: 2010/01/01 00:00:00 EPHEMERIS: igs15645.eph [precise] STOP: 2010/01/01 01:59:00 NAV FILE: brdc0010.10n OBS USED: 5443 / 5579 : 98% ANT NAME: 3S-02-TSATE NONE # FIXED AMB: 34 / 35 : 97% ARP HEIGHT: 1.000 OVERALL RMS: 0.010(m) REF FRAME: NAD_83(2011)(EPOCH:2010.0000) IGS08 (EPOCH:2010.0001) X: 1319482.451(m) 0.002(m) 1319481.685(m) 0.002(m) Y: -4656035.048(m) 0.004(m) -4656033.603(m) 0.004(m) Z: 4140724.263(m) 0.005(m) 4140724.204(m) 0.005(m) LAT: 40 44 29.30530 0.002(m) 40 44 29.33769 0.002(m) E LON: 285 49 20.27369 0.002(m) 285 49 20.25908 0.002(m) W LON: 74 10 39.72631 0.002(m) 74 10 39.74092 0.002(m) EL HGT: 16.818(m) 0.006(m) 15.568(m) 0.006(m) ORTHO HGT: 49.149(m) 0.016(m) [NAVD88 (Computed using GEOID12A)] UTM COORDINATES STATE PLANE COORDINATES UTM (Zone 18) SPC (2900 NJ )... Northing (Y) [meters] 4510383.994 211890.690 Easting (X) [meters] 569426.410 177219.598 Convergence [degrees] 0.53669189 0.21034828 Point Scale 0.99965933 0.99990912 Combined Factor 0.99965669 0.99990648 US NATIONAL GRID DESIGNATOR: 18TWL6942610383(NAD 83) BASE STATIONS USED PID DESIGNATION LATITUDE LONGITUDE DISTANCE(m) DI3830 NJTP PISCATAWAY CORS ARP N403225.841 W0742804.135 33170.2 DI0616 NYQN QUEENS CORS ARP N404310.261 W0734348.266 37892.7 DH3768 NJMT NJMT CORS ARP N404747.350 W0742859.339 26502.5 NEAREST NGS PUBLISHED CONTROL POINT AJ3348 NJ INST OF TECH 2 CORS ARP N404429.305 W0741039.726 0.0

5 OPUS uses GEOID12A to convert ellipsoid height to NAVD 88 How good is it?

6

7 DSWorld displays GEOID12A accuracy estimates

8 OPUS RULE OF THUMB: 1 σ = 4 cm 2 σ = 8 cm Bad survey? bad marks? bad OPUS?

9 OPUS-projects : first, run OPUS to harvest all project data OPUS automatically forms sessions from simultaneously observed marks, enabling multi-baseline processing and adjustment of redundant observations. Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload & processing tasks customize your processing using PAGES simple data quality analysis improve survey accuracy constrain to local networks publishing support (limited)

10 Why complicate OPUS? 2013-08-14OPUS Projects10 HATFIELD MCCOY ObservationSessionAdjustment OPUS solutions

11 Why complicate OPUS? 2013-08-14OPUS Projects11 session 001 OPUS solutions HATFIELD MCCOY ObservationSessionAdjustment

12 Why complicate OPUS? 2013-08-14OPUS Projects12 session 002 session N session 001 OPUS solutions HATFIELD MCCOY ObservationSessionAdjustment

13 Why complicate OPUS? 2013-08-1413 session 002 session N session 001 network adjustment OPUS solutions HATFIELD MCCOY ObservationSessionAdjustment

14 What’s all that really mean for me? OPUS solutions= pretty good, but each treated as independent and assumes “perfect” CORS. Sessions= simultaneously-observed marks processed together in sessions increases consistency. Adjustments= interlinking sessions through network adjustments increases accuracy. 2013-08-14OPUS Projects14

15 OPUS Projects15 geodesy.noaa.gov/OPUS is the access point for all things OPUS. 2013-08-14 NGS > OPUS

16 OPUS Projects16 “Options” allows any user with your project id to add data. 2013-08-14 NGS > OPUS > options

17 NGS > OPUS > options > project ID > upload mark description … and a mark description.

18 OPUS Projects18 the “Projects” link 2013-08-14 NGS > OPUS

19 OPUS Projects19 … launches the OPUS Projects gateway page. 2013-08-14 NGS > OPUS > projects

20 Limitations? Uploads through OPUS-Static. – Dual-frequency. – 2 hrs ≤ data span ≤ 48 hrs (≤ 2 GPS midnights). – Observation interval = a factor of 30 (seconds). Minimum project size. – None Maximum project size. – There are practical limits to a project’s maximum size. – About 100 marks in a single session. – Number of data files < a few hundred. 2013-08-07Introduction20

21 OPUS Projects21 OPUS Projects Training Because of its increased complexity, training is required to be an OPUS Projects manager. These workshops are usually two day in length and small so that there is ample time for one-on-one interaction with the instructor. Check the NGS training center schedule for upcoming workshops run by NGS. 2013-08-14

22 Things To Come. OPUS Projects improves because your criticisms and suggestions. Although we can’t act upon every comment, we do appreciate and consider every one. They have and will continue to steered development. Here are a few things already in the works: Allowing data files < 2 hrs in duration. Better integration with CORS. Better support for publishing to the NGSIDB. 2013-08-0722Introduction

23 User guide in final development


Download ppt "Tools to help complete “Height Mod” Surveys OPUS & OPUS Projects Joe Evjen, Geodesist, NGS Height Modernization Eastern States Regional Tuesday, March."

Similar presentations


Ads by Google