Presentation is loading. Please wait.

Presentation is loading. Please wait.

Environmental Committee Response STUDY GROUP COMMITTEES Meeting Notice Sensitive Facilities Committee 03 February 2000 Meeting.

Similar presentations


Presentation on theme: "Environmental Committee Response STUDY GROUP COMMITTEES Meeting Notice Sensitive Facilities Committee 03 February 2000 Meeting."— Presentation transcript:

1 Environmental Committee Response STUDY GROUP COMMITTEES Meeting Notice Sensitive Facilities Committee 03 February 2000 Meeting

2 Abatement Measures & Strategies n Contra Flow During Daytime Hours n Felt to have a minimal benefit n Not worthwhile to pursue

3 n Equal Distributions of arriving flights n This would be a non-equitable solution Abatement Measures & Strategies

4 n Look at preferential use of 17R- 35L at night n Eliminate the 15-degree divergence on 17R (take off to the south) n Prevents negative impact Abatement Measures & Strategies

5 n Group supports flight tracking systems n 60 to 65 Ldn is considered an uncomfortable noise level n Seek out non-federal funding Abatement Measures & Strategies

6 n Elaborate on what an easement purchase is n Tax policies for 60+ Ldn levels n Property Valuation Administration (PVA) - Jefferson County n State income tax Noise Mitigation Measures

7 n Should include a “noise staff” at RAA n Conduct regularly scheduled public information meetings Noise Mitigation Measures

8 n The committee felt that the Leigh Fisher Associates did a good job in this area Noise Mitigation Measures

9 n Only a few samples taken to date n Give us your name, address, and phone number if you think yours should be sampled. n Will try to map out results Soot Study


Download ppt "Environmental Committee Response STUDY GROUP COMMITTEES Meeting Notice Sensitive Facilities Committee 03 February 2000 Meeting."

Similar presentations


Ads by Google