W. Suchorzewski, WUT, 12.06.2007 29 th November 2005 REVENUE Revenue Use from Transport Pricing 5FP – DGTREN 2004-2005 Urban case studies – Warsaw Warsaw.

Similar presentations


Presentation on theme: "W. Suchorzewski, WUT, 12.06.2007 29 th November 2005 REVENUE Revenue Use from Transport Pricing 5FP – DGTREN 2004-2005 Urban case studies – Warsaw Warsaw."— Presentation transcript:

1 W. Suchorzewski, WUT, 12.06.2007 29 th November 2005 REVENUE Revenue Use from Transport Pricing 5FP – DGTREN 2004-2005 Urban case studies – Warsaw Warsaw University of Technology

2 W. Suchorzewski, WUT, 12.06.2007 Revenue – urban case studies Work Package 5 studied four Case Studies of various scale and approach: Oslo Warsaw Edinburgh Cross-boundary acceptability

3 W. Suchorzewski, WUT, 12.06.2007 Congestion charging in national transport policy 2001: National Transport Policy for 2001-2015 – sustainable development cities – parking, bridges, congestion - entrance to city centers tolling: motorways, cities – parking, bridges, congestion - entrance to city centers 2005: National Transport Policy for 2006-2025 charges for entrance to central areas of big cities, for crossing selected bridges, etc. „in addition to parking fees, tolls for using motorways and on heavy vehicles - charges for entrance to central areas of big cities, for crossing selected bridges, etc.”

4 W. Suchorzewski, WUT, 12.06.2007 Warsaw General objective to validate the feasibility of approaches suggested in the REVENUE project vis-à-vis revenue use from MC pricing Proposed regulation schemes: based around the allocation of increased revenue from congestion charging (toll charged at cordon line) for roads / public transport investment

5 W. Suchorzewski, WUT, 12.06.2007 Warsaw 1,7 million inh, agglomeration 2,5 million over 400 cars per one thousand inh. Public transport share – 65% of motorized trips Revenues from farebox covering 45% of operating public transport costs Congestion charging listed as longterm measure in transport policy adopted in 1995 but no plans to implement it in visible future

6 W. Suchorzewski, WUT, 12.06.2007 Four options 1.No charging (except parking charging) 2.Charging - toll – 4.5 PLN (€1.12) - cordon around the center – 14 sq. Kms 3.Charging with revenues used to invest in new ring roads 4.Revenues used to upgrade tramway lines to LRT standard

7 W. Suchorzewski, WUT, 12.06.2007 Cordon

8 W. Suchorzewski, WUT, 12.06.2007 Gates

9 W. Suchorzewski, WUT, 12.06.2007 Findings Road traffic reduction on the cordon: introduction of toll – reduction by 30%, construction of ring road (outer zone) – impact insignificant No of PT passengers crossing gates to the CBD area - growth – 5,5 %, additional tram line on North bridge – small impact

10 W. Suchorzewski, WUT, 12.06.2007 Findings – speed in peek hour option 1 option 2 option 3 option 4 Metropolitan area 48.33248.88349.09348.925 Central area 35.67136.62436.80136.750 City center 31.8236.40936.61136.490

11 W. Suchorzewski, WUT, 12.06.2007 Findings Speed increase (for vehicles): whole metropolitan area: –tool – 0,6 km/h, –toll plus bridge on the ring road – 0,8 km/h city center: –tool +4,6 km/h, –tool plus bridge + 5 km/h

12 W. Suchorzewski, WUT, 12.06.2007 Financial and ecomic analysis Financial analysis options Economic analysis options 234234 NPV (mln Euro) 482,736,22,9-316,811,916,5 IRR41,89,36,3---6,56,9

13 W. Suchorzewski, WUT, 12.06.2007 Survey - drivers Should charging be introduced in 5-10 years? YESNO don’t know Total 26%67%7%100% Toll rate preferred 10 PLN5 PLN2 PLN don’t know anotherTotal 6%13%31%13%37%100% How to use revenues? roads 100% roads - 50% PT - 50% PT – 100% mayor’s decissio n otherTotal 52%15%7%3%22%100%

14 Survey - stakeholders Should charging be introduced in 5-10 years? YESNO don’t know Total 85%11%4%4%100% Appropriate toll rate 10 PLN5 PLN2 PLN don’t know anotherTotal 20%46%19%0%0%15%100% How to use revenues? roads 100% roads - 50% PT - 50% PT – 100% mayor’s decissio n otherTotal 4%4%45%35%4%4%11%100%

15 W. Suchorzewski, WUT, 12.06.2007 Warsaw - main findings Under present traffic and economic conditions the social benefits of cordon charging would be limited. The financial viability and attitude of stakeholders towards the charging concept may stimulate decision makers to implement charging The direction of EU / National transport policies are important influences which could help stimulate introducing of fiscal measures.