Exercise Find a schedule that minimises makespan..

Similar presentations


Presentation on theme: "Exercise Find a schedule that minimises makespan.."— Presentation transcript:

1 Exercise Find a schedule that minimises makespan.

2 S 1,12,14,13,1 T 1,22,23,24,2 3,31,34,32,3 984 4 563 6 1049 2 Iteration 1: C max =25 Answer

3 Machine 1 1,2,3 L max (1)=4 Machine 2 2,1,3 L max (2)=5

4 Machine 3 3,1,2 L max (3)=0 Machine 4 2,1,3 L max (4)=3

5 Machine 2 is bottleneck. S 1,12,14,13,1 T 1,22,23,24,2 3,31,34,32,3 984 4 563 6 1049 2 Iteration 2: C max =30

6 Machine 1 3,2,1 L max (3)=0 Machine 3 2,1,3 L max (1)=3

7 2,1,3 L max (4)=0 Machine 4

8 Machine 1 is bottleneck. S 1,12,14,13,1 T 1,22,23,24,2 3,31,34,32,3 984 4 563 6 1049 2 C max =33 Can we decrease C max ({1,2}) ? Resequencing machine 2 gives no improvement ! (Check this !)

9 Iteration 3: C max =33 Machine 1 2,1,3 L max (4)=0 Machine 4 3,2,1 L max (4)=0

10 No machine is a bottleneck! S 1,12,14,13,1 T 1,22,2 3,2 4,2 3,31,34,32,3 984 4 563 6 1049 2 Final schedule: