Presentation is loading. Please wait.

Presentation is loading. Please wait.

VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.

Similar presentations


Presentation on theme: "VERMONT COMMUNICATIONS (VCOMM) March 2, 2006."— Presentation transcript:

1 VERMONT COMMUNICATIONS (VCOMM) http://www.dps.state.vt.us/need/ March 2, 2006

2 Topics Steps to Functional RFP Steps to Functional RFP –Channel Plan –System Inventory –Design Criteria Dispatch Study Dispatch Study

3 Channel Plan Voice communications Voice communications Voice paging Voice paging Mobile data Mobile data Narrow banding Narrow banding Frequency pooling Frequency pooling Frequency reuse Frequency reuse Determine needed channel capacity based on 95%/95% Determine needed channel capacity based on 95%/95% Develop channel plan Develop channel plan

4 System Inventory and Coverage Snapshot of current systems Snapshot of current systems Base stations (Transmitters and receivers) Base stations (Transmitters and receivers) –Location –Antenna –ERP –Frequencies –Coverage (Propagation Study) Mobiles Mobiles Portables Portables Pagers Pagers

5 Design Criteria Geographic coverage Geographic coverage Coverage standard (95%/95%?) Coverage standard (95%/95%?) –Mobile/Portable/Pager Capacity Capacity Analog/Digital/P25/Narrow-Band Analog/Digital/P25/Narrow-Band One or two radio solution One or two radio solution System of Systems System of Systems –Gateways –How to phase

6 Functional RFP System Inventory Channel Plan Functional RFP Design Criteria

7 Macro Dispatch Study Next Steps Next Steps –Identification of current and accurate dispatch call volume data for demand projections, staffing plans, and network capacity planning –Analysis of operating expenses and other associated costs in support of financial models of the intended restructured environment for establishing/negotiating “fees for service”

8 Macro Dispatch Study Next Steps (Continued) Next Steps (Continued) –Assessment of people factors for role definition, current capabilities, skills development, or management potential, career path mapping, or training programs – creation of a human resources plan if one does not exist. –Documentation of current practices for standardization and best practices transitions –Preliminary engineering to identify facility or network alteration requirements in addition to deployment of new mobile data and two-way radio capabilities, and enhancing security and survivability of public safety communications services.

9 Dispatch Facilities

10 Dispatch RFP Develop RFP (Based on Summer Study Committee and Macro Reports) Develop RFP (Based on Summer Study Committee and Macro Reports) Define Current System Define Current System –Current configuration of dispatch –Inventory of equipment at each dispatch facility –Inventory of current staffing at each dispatch facility –Current operating costs at each dispatch facility –Call volume current at each dispatch facility –Time and motion study of selected facilities

11 Dispatch RFP Define Future Needs Define Future Needs –Call volume future 5 and 10 year projection –Security –Diversity of communications links –Redundancy and fault tolerance –Links to other systems

12 Dispatch RFP Development and evaluate alternatives to meet current and future needs Development and evaluate alternatives to meet current and future needs –Integration with two-way radio and data systems –Integration with new E9-1-1 system –Staffing –Estimate costs –Methods to assess costs to users –Analysis of Pros and Cons of Dispatch RFP

13 Dispatch RFP Develop Recommended Standards and Practices Develop Recommended Standards and Practices –Standard Operating Procedures –Recommended Training –Assessment of Costs

14 The End QUESTIONS?


Download ppt "VERMONT COMMUNICATIONS (VCOMM) March 2, 2006."

Similar presentations


Ads by Google