RIVER MORAČA Case study. ENERGY DEVELOPMENT STRATEGY OF MONTENEGRO BY 2025 Out of its total hydro potential on the main water currents of 9,846 GWh, Montenegro.

Similar presentations


Presentation on theme: "RIVER MORAČA Case study. ENERGY DEVELOPMENT STRATEGY OF MONTENEGRO BY 2025 Out of its total hydro potential on the main water currents of 9,846 GWh, Montenegro."— Presentation transcript:

1 RIVER MORAČA Case study

2 ENERGY DEVELOPMENT STRATEGY OF MONTENEGRO BY 2025 Out of its total hydro potential on the main water currents of 9,846 GWh, Montenegro is exploiting less than 1,800 GWh (HPP Perućica and HPP Piva), i.e. somewhat more than 17%. HPPs on the Moraca River of total installed capacity of 693.7 GWh/annually HPP Komarnica of installed capacity 231.8 GWh/ annually. Planned investment by 2025 amount 565 million EUR.

3 ENERGY DEVELOPMENT STRATEGY OF MONTENEGRO BY 2025

4 RIVER MORAČA

5 HPP on Moraca river will consist of storage hydro power plants of 128 MW with 150m high dam, HPP Andrijevo and three downstream by flow hydro power by 38 MW, Raslovići HE Milunovići and Zlatica.

6 Case study Scenario 4 (2060) Water use – Land use Very bad economic situation causes loss of power in the govarnmental in relaton to the private sector. Loss of concessions, corruption. Migration Poverty leads to increased colonization of the region rich in water, Moraca river as well. This is linked to change in land use, agriculture increases, cuting the trees in the region, incresing erosion. Biodiversity and nature Loss of biodiversity in the region Poor maintenance leads to risk of cracking the dam.

7 Case study Scenario 4 (2060) Climate change Decreased water potential No water in the capital city Podgorica Political aspect Reduced water resources lead to conflict on local and regional level. Reducing the amount of potable water. Social aspect NGO are to weak to do something. Mainly due to migration in the region elderly people Health care is very bad

8 Case study Scenario 4 (2060) Thank you

9 Title Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Vivamus et magna. Fusce sed sem sed magna suscipit egestas.


Download ppt "RIVER MORAČA Case study. ENERGY DEVELOPMENT STRATEGY OF MONTENEGRO BY 2025 Out of its total hydro potential on the main water currents of 9,846 GWh, Montenegro."

Similar presentations


Ads by Google