Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Similar presentations


Presentation on theme: "Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984."— Presentation transcript:

1 Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984

2 Promote Research, Development and Popularization of Non-Conventional and Renewable Sources of Energy VISION Provision of minimum illumination to all Remote Un- electrified Villages/hamlets by 2015 Increase the share of Renewable Energy to 10% of the total power mix by 2020 Accelerated use of Renewable Energy Technology in all sectors of economy Promote Research, Development and Popularization of Non-Conventional and Renewable Sources of Energy VISION Provision of minimum illumination to all Remote Un- electrified Villages/hamlets by 2015 Increase the share of Renewable Energy to 10% of the total power mix by 2020 Accelerated use of Renewable Energy Technology in all sectors of economy Mission

3 Major Programs being Implemented by OREDA 1.Solar Water Pumping Program for piped drinking water supply 2.Solar water pumping program for Irrigation 3.Rooftop and off-grid solar power plants 4.Distribution of solar lanterns 5.RE Power Projects 6.Implementation of RPO and REC mechanism 7.Village Electrification 8.Unnat Chulla Abhiyan 9.National Program of Biogas and Manure Management 10.IEC and Outreach

4 1.Solar Water Pumping Program for piped drinking water supply Phase I ( RWSS) For 18 IAP Districts only Target : 1762 No. installed : 1762 Phase II ( RWSS) For 18 IAP Districts only Target : 1762 No. installed : 1682 Phase III ( RWSS+ MNRE) For all Districts Target : 2000 No. installed : 312

5 Solar PV Pumping Program for Irrigation Project is on the verge of starting Target for 2014-15: 3000 Steering Committee and finance committee have cleared the project Financial arrangement Target : 2610 Cost of each projectRs 5.50 lakhTo be finalised through tenders MNRE Share (CFA)RS 1.21 lakhFirst advance available State share through S&T budgetRs 1.99 lakhFirst Advance available OLIC shareRs 2.00 lakhAwaited Farmer’s shareRs 0.30 lakhTo be collected

6 Rooftop and off-grid Solar Power Plants The program is mainly implemented for Government buildings, residential schools, hostels, Sevashrams, Health centres, police stations, forest offices, district offices, blocks, Panchayats etc. Total installed capacity till 14-15: 5.114 MW Projects Under implementation during 15-16: Hostels under BJRCY: 25 x 10 KW SCST hostels/Schools : 19 x 10 KW Kendu leaf godowns : 17 x 3 KW District Collectorates : 6 X 10 KW EMRS schools : 2 x 5 KW Primary Health Centres : 6x 6 KW Police stations : 39 x 2.5 KW Petrol pumps: 2 x 2 KW Sevasharm schools ( 55 Nos): 297 KW

7 RE Power Projects Total installed capacity: Solar : 43.0 MW + 5.0 MW under REC Biomass:20.0 MW + 30.4 MW under REC Projects in pipe line Solar : NIL Biomass: 10 MW New Application received Solar : Nil Biomass : 12 MW

8 Implementation of RPO and REC mechanism In Odisha the RCPO Regulation 2010 is under implementation as per which the quantum of obligation is as under OERC has come up with a draft regulation as per which the quantum of obligation is as under Minimum quantum of purchase in percentage ( in terms of energy consumption in state in KWH) RenewableCo-generationTotal SolarNon Solar 2010 -11-1.003.504.50 2011 -120.101.203.705.00 2012 -130.151.403.955.50 2013 -140.201.604.206.00 2014 -150.251.804.456.50 2015 -160.302.004.707.00 Year-wise targetSolar Source (%) Non Solar sources (%)Total (%) 2015-160.406.607.00 2016-170.807.208.00 2017-181.207.809.00 2018-191.608.4010.00 2019-202.009.0011.00

9 Implementation of RPO and REC mechanism (Contd…) Obligated entities identified in the state : 62 Captive consumers : 50 Open access consumers: 12 Partial compliants: 20 OREDA had filed a petition in OERC against all non compliant obligated entity 20.11.2014 requesting action under Section 142. Hearing of the case has been concluded on 5 th May 2015 but Order has been kept reserved.

10 Projects Accreditated by OREDA Under Energy Certificate (REC) Mechanism Sl. No. Name of the R.E. Generator Installed capacity (in MW) Date of Registration Type of RE Project Status Till Date 1 J.K. Paper Mills 5.4 MW07.09.2012BiomassEarning and Trading RECs 2 OCL India Limited 2.5MW20.05.2013Solar PVEarning and Trading RECs 3 J.K. Paper Mills 25 MW05.09.2013BiomassEarning and Trading RECs 4 Mahanadi Coalfields Ltd.2 MW14.11.2014Solar PVCommissioned 5 Kalinga Institute of Social Science (KISS)0.5 MW Not yet Registered Solar PVCommissioned 6 MBPS Control & Power system limited 1 MW Not registered Solar PVNot Commissioned

11 Village Electrification Villages electrified Under RVEP till 11-12 : 1621 Under pilot project of MNRE :1 Under DDG : 7 ( work in progress) Projects in pipe line: Projects under DDG : 7 Tribal hamlets/ habitation with financial assistance from MoTA: 250 Villages identified for electrification by STSC Dev. Department : 700

12 Distribution of Solar Lanterns The program for distribution of solar lanterns to weavers and handicraft artisans started in 2013-14 Lanterns distributed till end of 2014-15 Weavers : 25,503 Handicraft Artisans:16,428 Total 41,932 For the current year apart from weavers and handicraft artisans households using kerosene for illumination purpose in KBK region and western Odisha are also being included under the program. Target for 2015-16 : 20,000

13 National Biogas and Manure Management Program (NBMMP) Total potential of domestic biogas plants : 6 00,000 Plants constructed till 2014-15: 2,38,872 Target for 2015-16:5,100 Achievement till July 2015: 211

14 Unnat Chullah Abhiyan Target for 2015-16 Family Type : 15000 Community Type : 6000 It has been programmed to construct 20,000 PARISHAD model community chulah ( with chimney) in schools & Anganwadi centers under MDM with financial support of state Govt. The said chulah has been tested in IMMT, Bhubaneswar and performance parameter is found to be satisfactory. 563 chulah have been installed till July 2015 in schools. MNRE may consider CFA for above category of chulah under UCA..

15 Perspective Plan till 2018 -19 S/NDescription of the sector year wise coverageTotal Total capacity in MW 15-1616-1717-1818-19 1Solar Pumping for Irrigation300050006000 2000060 2Solar Pumping for drinking water supply40005000 60002000018 3Electrification of tribal hamlets/ habitations500 200010 4Rooftop solar power plants in BJRCY Hostels49--- 0.5 5 Rooftop solar power plants and drinking water supply in 6000 hostels under SCST Development Department 50015002000 600060 6 Provision of high mast lights and street lights in all Gram panchayats 50015002000 600002 7 Solar electrification of government buildings in different districts 5MW 10 MW 30 MW30 8 Solar power to Urban Local Bodies for substitution of power consumption on account of street lights 1MW3MW4MW10MW 18 9 Distribution of solar lanterns to weavers, handicraft artisans and households using kerosene for illumination purpose in KBK region and western Odisha 200003000050000 1500001.5 Total capacity200 MW


Download ppt "Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984."