Presentation is loading. Please wait.

Presentation is loading. Please wait.

T. Bowcock Liverpool December 00. 22-Nov-00T. Bowcock University of Liverpool Status CDF/GRID.

Similar presentations


Presentation on theme: "T. Bowcock Liverpool December 00. 22-Nov-00T. Bowcock University of Liverpool Status CDF/GRID."— Presentation transcript:

1 T. Bowcock Liverpool December 00

2 22-Nov-00T. Bowcock University of Liverpool Status CDF/GRID

3 22-Nov-00T. Bowcock Upgrade 20GByte Disks Fans Replaced Software –Redundant OS on disks –GLOBUS job submission

4 22-Nov-00T. Bowcock Jan/Feb 01 Projected System Upgrade –Code will be productized Packeaged Rewritted (I/O subsystem retuned) Batch Queues –Manuals and Documentation New Staff online –GH, JP

5 22-Nov-00T. Bowcock HEP applications Has run (or is running) simulations –ATLAS Low mass Higgs –DELPHI Higgs and W Physics –H1 Backgrounds (0.25Gevents Full sim) USED FOR ANALYSIS of SIMULATED DATA –LHCb(*) –HERA Machine Development

6 22-Nov-00T. Bowcock Comments LHCb –Part of EU-Datagrid through LHCb –Large Experimental Coverage –Important for PR and testbed program –BUT problem… We have to scale down our preferred level of commitment –Middleware defined (April 01) –Analysis Developments with H1

7 22-Nov-00T. Bowcock JREI 00 Highest ranked PP HEP submission –Wide support and alpha rating –Lost out to Jodrell Bank and Dark Matter –Supported by PPARC No funding from this route…

8 22-Nov-00T. Bowcock EPSRC/HPC+… Submission for NW computing with Daresbury Laboratory (CLRC) Apply for E-science funding –NW Tier-1/2 Centre Funding from Wellcome being pursued –Meeting with Dexter Jan 01?

9 22-Nov-00T. Bowcock For CDF Prioritize carefully Maybe we should concentrate on CDF JIF as source of computer power… GRID plans integrated with Liverpool Blueprint (Dec 00)


Download ppt "T. Bowcock Liverpool December 00. 22-Nov-00T. Bowcock University of Liverpool Status CDF/GRID."

Similar presentations


Ads by Google