CS Thermal Analysis Status Heating and Cooling of CS During Normal Operation - SN & DN Operation –Overall Heat Balance –Heating of Center Stack First Cut.

Similar presentations


Presentation on theme: "CS Thermal Analysis Status Heating and Cooling of CS During Normal Operation - SN & DN Operation –Overall Heat Balance –Heating of Center Stack First Cut."— Presentation transcript:

1 CS Thermal Analysis Status Heating and Cooling of CS During Normal Operation - SN & DN Operation –Overall Heat Balance –Heating of Center Stack First Cut Thermal-Stress Analysis of CS Study of Impact of CS Tile Size on Thermal Stress

2 Heating and Cooling of CS During Normal Operation ANSYS 2D Axisymmetric Model –CS radiatively Cooled to IBD hs, OBD, PP and VV –CS assumed perfectly insulated from OH & PF’s –CS Tiles assumed in perfect contact with Inconel Casing –IBD hs, OBD, PP and VV actively cooled Equivalent film coefficient used – need to review and verify for new design For CS, only modest coiling assumed at IBDhs Single Null (SN) and Double Null (DN) modes –No Natural Divertor Mode defined in GRD (was worse case in original design) CS Surface emissivity varied –0.7 for Graphite (without Lithium) –0.3 for Lithium Coated Graphite (best guess) 14 MW, 5s pulse, 1200s rep rate –Largest Power Fraction to IBD hs –~1/3 Power Uniformly Radiated to All exposed Surfaces

3 Applied Heat Fluxes Average Heat removal rate thru Cooling Systems (IBDhs, OBD, PP and VV) should total 14e6*5/1200 = 58.3 kW after fully ratcheting (see plots) Question: The GRD requirement for the CSFW is fairly modest. Are there scenarios not included here which could lead to higher heat fluxes?

4 End of 10 th Pulse (Not yet fully ratcheted) CSFW CSAS IBDHS IBDVS

5 CS Inconel Casing Tavg = 342 C

6 Thermal Equilibration Within Tile Cooling

7

8

9 CS Inconel Casing Tavg = 455 C

10

11

12

13 CS Inconel Casing Tavg = 286 C

14

15

16

17 CS Inconel Casing Tavg = 370 C

18

19

20 Summary of Heating in CS Inconel Casing

21 Observations Highest Tile temperatures at IBDhs where largest fraction of Power is deposited –SN much higher than DN as expected PP Cooling picks up largest fraction of total heat with VV, OD & ID picking up comparable smaller amounts –Variation of heat load to cooling systems* not significantly different for scenarios analyzed Highest Bulk Heating of CS Inconel Casing due to DN Operation (342C at  =.7, 455C at  =.3) *For SN all IBDhs heat load to lower cooling system

22 First Cut Thermal-Stress Analysis of CS Fully Ratcheted Temperature Distribution from Previous Thermal Analysis of Single Null (highest tile temperatures) with emiss=.7 used CS Tile thermal stress only –Assuming ATJ Structural Properties (first cut - not temperature dependent) –Initial Run as 2D axisymmetric, followed by 3D cyclically symmetric –Compares single (very) large tile to segmented tile (at Inboard Divertor Horizontal Section) CS Casing thermal stress only –Assumes Inconel 625 Properties (first cut - not temperature dependent) –Model includes CS Casing, VV and Connecting Bellows

23 Temperature Distribution Following Fully Ratcheted Pulse Graphite Only

24 Axisymmetric No Split

25 Axisymmetric With Split

26 Cyclically symmetric No Split

27 Cyclically symmetric With Split

28

29 Temperature Distribution Following Fully Ratcheted Pulse (At Max CS Average Temp) Vacuum Boundary Only

30

31

32

33

34

35 Observations Segmenting of tile Poloidally has modest affect (slightly lower Seqv) but segmenting toroidally leads to higher stresses. Tile Stress levels (without including temperature dependency on Properties and allowables) show max stresses ~1/2 yield Inconel Casing Stress levels are also ~1/2 yield

36 Study of Impact of CS Tile Size on Thermal Stress Simplified Geometry – Segmented Cylinder ATJ Graphite Properties assumed 1 MW/m2 Heat Flux for 5 sec Pulse –Much Higher than GRD Spec 0.1-0.2 MW/m2 Freely supported tile (ie unconstrained) –Stresses from Thermal Gradients Results show stresses increase significantly with tile size

37 Results Results show stresses increase significantly with tile size

38

39

40

41

42

43

44

45

46


Download ppt "CS Thermal Analysis Status Heating and Cooling of CS During Normal Operation - SN & DN Operation –Overall Heat Balance –Heating of Center Stack First Cut."