1 Sprint 103 Review / Sprint 104 Planning March 25, 2013

2 Sprint Resource Pages For this sprint, visit: https://developer.connectopensource.org/display/NHINProgres s/Sprint+103 https://developer.connectopensource.org/display/NHINProgres s/Sprint+103 For next sprint, visit: https://developer.connectopensource.org/display/NHINProgres s/Sprint+104 https://developer.connectopensource.org/display/NHINProgres s/Sprint+104 For information on the CONNECT 4.0 release, visit: https://developer.connectopensource.org/display/CONNECT40 /CONNECT+4.0 https://developer.connectopensource.org/display/CONNECT40 /CONNECT+4.0 For information on the CONNECT 4.1 release visit: (Currently Under Construction) https://developer.connectopensource.org/display/CONNECT40 /4.1+%28Draft%29 https://developer.connectopensource.org/display/CONNECT40 /4.1+%28Draft%29 2

3 Sprint 103 - Community Contributions Open forum for community members to share o Their work of the last two weeks o Their needs from CONNECT o Ideas and suggestions Community contributions o UPMC - CONNECT 4.0 Alpha 1 / WebSphere o SSA - CONNECT 4.0 WebSphere 3

4 Sprint 103 Summary - Cumulative Flow 4 To Do In Progress QA Done

5 Sprint 103 Summary - Burndown Chart 5

6 Sprint 103 Summary – Sprint Stats Points committed = 24 Pulled out 1 point of effort, totaling 23 points for sprint Points remaining (unclosed) at end of sprint = 4 Points completed in sprint (velocity) = 19 6

7 Sprint 103 – Themes & Tasks 4.0 Partner and Community Support –SSA 4.0 install on WAS –CMS-CCSQ 4.0 install on WL 11g or 12c –CMS-OFM 4.0 install on WAS 7 JDK 1.7 –Respond to IHS re the Direct ticket (CONN-279) –Community support through forum responses and guidance 4.1 Enhancements –Multi Spec QD/ RD End point enhancement for DoD/SSA (pending DE&I approval) –Installation improvements through community engagement –Continued development of a robust CI and automated test environment –JBoss - (CONN-25) in the Ordered features list Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=1014 0 7

8 Sprint 103 - What We are Showing Today 4.0 Community and Partner Support Work Completed to Support the CONNECT Community and Federal Partners –CONN-310Standardize recommended java options (heap sizes, perm sizes) across installation instructions –CONN-288Provide support for SSA and their efforts to download and install CONNECT 4.0 into their development environment –CONN-279As a CONNECT adopter, I want CONNECT 4.0 to be tested on WebSphere 7.x to validate whether CONNECT will work in my preferred environment –CONN-278As a CONNECT adopter, I would like assistance installing and configuring "Direct only" for CONNECT 4. –CONN-183Missing DIRECT_ERROR event in use case (Direct-A-Thon) –CONN-74As a CONNECT adopter/developer I want a clean property file (gateway.properties) so that there is no confusion with regards to the unused properties or default values. 8

9 Sprint 103 - What We are Showing Today CONNECT 4.1 CONNECT 4.1  JBoss Support –Another strategic application server the community wanted CONNECT 4.0 tested with was JBoss –JBoss provides an open source app server that supports FIPS requirements –CONN-303 - As a CONNECT adopter, I want CONNECT to be deployable in JBOSS, so that I can use my preferred application server for health data exchange –CONN-314 - Add JBoss 7 profile –CONN-315 - Create JBoss 7 configuration info  CI and Build Improvements –A key goal for 4.1 was to increase the JUnit code coverage and reduce FindBugs errors for the Connect Core Library –The initial target was to remove all possible bugs from the library using the FindBugs tool and increase both our line and branch coverage by 20% –https://developer.connectopensource.org/display/CONNECT40/4.1+Code+Coveragehttps://developer.connectopensource.org/display/CONNECT40/4.1+Code+Coverage 9

10 Sprint 103 - What We are Showing Today CONNECT 4.1 CONNECT 4.1  Resolved Support Tickets –CONN-319Fix testMpi resource so it doesn't always get updated –CONN-307Interop testing for 4.1 –CONN-305Reverification testing for 4.1 –CONN-304Regression testing for 4.1 –CONN-301As a CONNECT user, I want the Direct feature to work out of the box on binary installations, so I can set up Direct more easily. –CONN-2994.1 patch release test plan –CONN-298release 4.0 as 4.1 –CONN-297merge all fixes in CONNECT_integration into branch 4.0-integration in order to prepare to release 4.1 –CONN-295Interop: Update harness for repeatable Ldev11 tests –CONN-292CONNECTSamlAssertionValidator Logic needs review 10

11 Sprint 103 - What We are Showing Today CONNECT 4.1 CONNECT 4.1  Resolved Support Tickets –CONN-280PatientDB implementation does not work –CONN-244Create QA Mail Server –CONN-92Remove NHINC_PROPERTIES_DIR environment variable –CONN-61GUIs deployed in the EAR (GF) cause the admin console to misbehave after restart –CONN-40Audit Log Transforms (PD) throws exception in server log –CONN-37NPI SAML attribute is not supported in CONNECT 11

12 Sprint 103 - What We are Showing Today CONNECT 4.0 Implementation Support CONNECT 4.0 Implementation Support –Forums + Community Support http://www.connectopensource.org/developer-resources/forums 12

13 Sprint 104 - Proposed Themes 4.1 Release Preparation –Complete functional and regression testing –Continue with installation testing –Complete and finalize supporting documentation 4.0 Partner and Community Support –CMS-OFM 4.0 install on WAS 7 JDK 1.6 –Support CMS with their planned Direct Pilot –Provide support for SSA testing of 4.0 –Community support through forum responses and guidance Incorporate CI Testing Improvements to Additional App Servers Start Work on Design for Enhancements to Auditing Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=1014 0 13

14 CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be April 8 th –CONNECT 4.0 Blogs and Forum posts –CONNECT 4.0 user group meeting being planned for mid to late May at George Washington University 14

15 Questions and Discussion 15