Presentation is loading. Please wait.

Presentation is loading. Please wait.

OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative Construction Plan John Graybeal Life Cycle Architecture Review La Jolla, CA.

Similar presentations


Presentation on theme: "OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative Construction Plan John Graybeal Life Cycle Architecture Review La Jolla, CA."— Presentation transcript:

1 OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative Construction Plan John Graybeal Life Cycle Architecture Review La Jolla, CA

2 OOI CI LCA REVIEW August 2010 Agenda Iteration Task Development Process, Briefly Context of Construction Plan Construction Plan Description Strategy for Release 1 Execution

3 OOI CI LCA REVIEW August 2010 Iteration Task Development Process, Briefly Processes developed, extensively refined last iteration Design Materials: SE-15, SE-16, DE-01, DE-02, DE-03 Now have been boarded (in Alfresco) SE-15: Release Task Specification Process Talks about what we do before each iteration Before a Phase (Construction), make tasks for all iterations

4 OOI CI LCA REVIEW August 2010 Development Process Goal: ListITs (SE-15) An articulation of the information that initially defines an Iteration Task. Name: Brief phrase summarizing main purpose of the IT. Description: Narrative characterizing the fundamental activities required to accomplish the IT. Risk Associations: Risks related to the Iteration Task.

5 OOI CI LCA REVIEW August 2010 Context of R1 Construction Plan Developed this Construction Plan with an optimistic view Aggregated objectives from the subsystems What is possible given optimal staffing, dependencies This is plan as submitted in your Review Materials

6 OOI CI LCA REVIEW August 2010 Construction Plan Description Pointed to from Review Materials page http://www.oceanobservatories.org/spaces/download/attachments/22219908/OOICI_C onstructionPlan_R1_20100821_Rev1-00.pdf Construction Plan

7 OOI CI LCA REVIEW August 2010 Strategy for Release 1 Execution This plan represents aggregated objectives Next week: Analyze this plan across all 3 iterations, for: achievability consistency establishment of testing environment (and team) Will then be refined and tested during first Design Period By end of DP, will have ready version of Construction plan Adjust iterations 2 and 3 accordingly based on Iteration 1

8 OOI CI LCA REVIEW August 2010 Thanks ! Questions ?