1 Insulate for life PAROC CGL 80 Mounting on the building site Senior home in Rovaniemi, Finland Summer 2005 Jukka Sevón

2 Insulate for life PAROC CGL 80 For thermal, sound and/or fire insulation in cellar ceilings between cold garages (parking places, storages etc.) and warm flats. Product dimensions: 1200 x 200 x 50...250 mm. Thermal conductivity: 0,041 W/mK Compressive strength:50 kPa Tensile strength:80 kPa Product surface is possible to render ( or paint ). Production possible from Poland and Finland and in the near future also from Lithuania. Loose products packed on pallets. Small packages packed on pallets also from Poland.

3 Insulate for life Formwork of the intermediate floor between the ground and the first floor

4 Insulate for life The view from underside

5 Insulate for life Mounting of PAROC CGL 80...

6 Insulate for life...on top of the mould...

7 Insulate for life...lamella joints across

8 Insulate for life Concrete reinforcement...

9 Insulate for life...should be mounted as ready made wire nets...

10 Insulate for life...directly into the right position...

11 Insulate for life...to avoid unnecessary stepping on the insulation material

12 Insulate for life The reinforcement must be lifted up from the insulation...

13 Insulate for life...with plastic distance pieces

14 Insulate for life After mounting electrical and other outlets...

15 Insulate for life...is time for concreting

16 Insulate for life If the reinforcement...

17 Insulate for life...has forced the distance pieces into the insulation material...

18 Insulate for life...the reinforcement has to be taken off from the insulation

19 Insulate for life Some of the water in concrete will come out from the cast...

20 Insulate for life...as well as cement slurry which can be seen after decentering...

21 Insulate for life...the mould construction in the joints of CGL 80

22 Insulate for life More or less...

23 Insulate for life...as water...

24 Insulate for life...or hardened concrete

25 Insulate for life But not always or in every joint for it depends...

26 Insulate for life...also on how successful the mounting of lamellas is

27 Insulate for life PAROC CGL 80 is adheres very tightly to concrete and will not come off

28 Insulate for life CGL 80 will delaminate before the adhesive bonding breaks down (  mt 80 kPa )

29 Insulate for life Due to the even bottom of the mould, the surface of CGL 80 is very even too and there is no...

30 Insulate for life...need for underneath insulation mounting, separately frame, fasteners...

31 Insulate for life...extra adhesive and the surface of CGL 80 is ready for finishing work ( paint or render )

32 Insulate for life Summary The surface of the mould must planed lower position for the thickness of insulation. The surface of the mould must be clean if the mould is not new. CGL 80 must be mounted with crossing joints and very tightly against each other. Possible loose material out from the surface of insulation before concreting! Mounting of insulation is very easy! No upwards mounting, no dust into eyes, no separate frame or fasteners, no extra adhesive and drying. Many work phases can be ongoing at the same time → great savings in time and costs. Adhesive bonding automatically with the concrete’s own binder gives an even stronger bond than what is possible to achieve with traditional adhesive. You have to be careful when decentering as there is insulation material not concrete behind the mould.


Download ppt "Insulate for life PAROC CGL 80 Mounting on the building site Senior home in Rovaniemi, Finland Summer 2005 Jukka Sevón."