1 Lake Okeechobee Status Lake Okeechobee WRAC Committee David Unsell, PE March 28, 2007

2 Water Quality – Total Suspended Solids

3 Water Quality – Total Phosphorus

4 Algal Blooms and Toxins

5 Submerged Aquatic Vegetation

6 Monthly Submerged Aquatic Vegetation Transect Sampling OBJECTIVES: To understand changes in SAV communities as they relate to changes in water level and transparency

7 Submerged Aquatic Vegetation Transect Sites

8 Submerged Aquatic Vegetation Transect Sites

9 Submerged Aquatic Vegetation Transect Sites

10 Dry Conditions January 07 February 07 March 07

11 Exotic Vegetation Management

12 In-Lake Restoration Projects  Provided cost share funds of $450,000 to the City of Pahokee for Pahokee Harbor.  Provided cost share funds of $450,000 to the City of Pahokee for Pahokee Harbor.  Selected sites in and around the Clewiston lock to plant native pond apple and cypress along the pass and rim canal spoil islands while water levels are low.  Selected sites in and around the Clewiston lock to plant native pond apple and cypress along the pass and rim canal spoil islands while water levels are low.  Developed a Cooperative Agreement with the Florida Freshwater Fish and Game Commission to conduct sediment removal in the Cody's Cove area of the remnant organic berm on the NW marsh shoreline.  In discussions with the City of Belle Glade for navigational dredging and boat ramp extensions in the Belle Glade marina

13

14 Temporary Forward Pumps  Notice to Proceed with installation was issued to Lucas Marine Construction on March 21, 2007  April 4 the S351 pumps are ready to operate  April 11 the S354 pumps are ready to operate  April 18 the S352 pumps are ready to operate

15 Temporary Forward Pumps  Denise Arrieta, Construction Project Manager, 561-719-7572.  Tim Carter, Construction Division Director, 561-951-2543.  Cled Weldon, Engineering Department Director, 561-719-7573