L. BastidasB. Nijssen, H. GuptaW. EmmerichE. Small Big Delay ! l There is a big delay – 1 year l Cause: :Additional quality control of data was required :Very little participation from the community l Lately things have warmed up (last 2 months) :Several groups have submitted results of step 1 :Several groups have contacted us indicating they are currently working on the experiment l A new timeline has been proposed :Submitted for approval to the GLASS meeting in Japan :If no additional participation will go ahead with the 9 models already working.
3
L. BastidasB. Nijssen, H. GuptaW. EmmerichE. Small Submitted so far – STEP 1 only 1. SPONSOR – Institute of Geography, Russian Academy 2. SWAP – Institute of Water Problems, Russian Academy 3. SEWAB – GKSS Research Center, Germany 4. CBM – CSIRO, Australia Soon to be submitted 5. MOSAIC - NASA Goddard, USA 6. SSib – COLA, USA 7. VIC – U of Arizona, USA 8. BATS – UCLA, USA 9. Sib2 – USU, USA
4
L. BastidasB. Nijssen, H. GuptaW. EmmerichE. Small Other Modeling Groups l Additional groups that have expressed interest: :Noah – NOAA USA :ORCHIDEE – France :MOSES – Met Office UK :SSib – UCLA USA :CLASS - Canada
5
L. BastidasB. Nijssen, H. GuptaW. EmmerichE. Small Updated Timeline February 2004, Submission of final experimental protocol March 15 th,2004, Submission of model information and default parameter sets used by the models for semi-arid areas March 15 th, 2004, Distribution of forcing data to the participants through the website www.sahra.arizona.edu/pilpssanpedro October 31 st, 2004, Submission of default parameter simulations STEP 1 November 1 st, 2004, Distribution of calibration data for STEP 2 and STEP 3 November 30 th, 2004, Submission of results from STEP 2 – ad hoc calibrations January 31 st, 2004, Submission of results from STEP 3 – automatic calibrations February 1 st, 2005, Distribution of data for STEP 4 February 28 th, 2005 June 15, 2004, Submission of results from STEP 4 March 31 st, 2005 June 30th, 2004, Submission of results from STEP 5 April 1 st, 2005 July 1st, 2004, Distribution of data for STEP 6 April 30 th, 2005 July 30th, 2004, Submission of results from STEP 6 August/September 2005, Workshop for analysis of preliminary results, at Utah State University. January, 2006, AMS session for final analysis and presentation of results