Presentation is loading. Please wait.

Presentation is loading. Please wait.

E-SENS Electronic Simple European Networked Services eHealth Pilot Initiation Guide and Progress Monitoring.

Similar presentations


Presentation on theme: "E-SENS Electronic Simple European Networked Services eHealth Pilot Initiation Guide and Progress Monitoring."— Presentation transcript:

1 e-SENS Electronic Simple European Networked Services eHealth Pilot Initiation Guide and Progress Monitoring

2 Goal Member States in WP 5.2 to initiate the piloting stage Which path to follow? eHealth Pilot Initiation Guide and Progress Monitoring

3 At a glance Pilot - Stage 1 (scope) OpenNCP: Released v2.2.0 Update local installation of OpenNCP Regression Testing Progress Monitoring (method and tool) eHealth Pilot Initiation Guide and Progress Monitoring

4 Pilot - Stage 1 Pilot Scope Services eP/eD and/or PS services Technology NCP enhanced with Evidence Emitter (e-SENS ABB) Environment Pre Production Testing (PPT) MS ES, PT, LU, IT, GR Starting at 8 th of June 2015 MS not able to comply with common date, MUST start ASAP. eHealth Pilot Initiation Guide and Progress Monitoring

5 OpenNCP Release 2.2.0 e-SENS WP5.2.1: ePrescription/ Patient Summary Towards Piloting Stage – Meeting 1 The OpenNCP Community has released a new stable release from the OpenNCP, following the full integration of the Evidence Emitter BB from e-SENS, and the tests made by the MS at the Luxembourg CAT (Apr15). OpenNCP 2.2.0- RC3 -> OpenNCP 2.2.0

6 Update Local Installation Artifacts loaded in JoinUp -OpenNCP 2.2.0 Release Changelog and Notes: -https://openncp.atlassian.net/wiki/display/ncp/2.2.0+Release+Changelog+and+Not eshttps://openncp.atlassian.net/wiki/display/ncp/2.2.0+Release+Changelog+and+Not es -OpenNCP Knowledge Base: -https://openncp.atlassian.net/wikihttps://openncp.atlassian.net/wiki -OpenNCP Support Team: -jira@openncp.atlassian.netjira@openncp.atlassian.net "Title" (You can change this in the menu "Insert-> Header and Footer")

7 Regression Testing Preparation Define - Critical Test Data for functional test Generate - Critical Test Data for functional test Communicate to other MSs - Critical Test Data Perform Execute Functional Test Iteratively, until secure functional conformance reached; Report Functional Test Feedback Use appropriate feedback tool (to be defined by e-SENS) eHealth Pilot Initiation Guide and Progress Monitoring

8 Progress Monitoring (method and tool) Method Weekly meeting (60 minutes) Define Week day and hour (Wednesday, 12:30 CET?) Participants (1 MS representative) Time Window Bi-weekly Weekly during the month before a new Pilot Stage start; Tool Tcon eSENS_MS_ProgressReport – UPDATE Explain the tool to MS eHealth Pilot Initiation Guide and Progress Monitoring

9 Thank you! eHealth Pilot Initiation Guide and Progress Monitoring Facebook: www.facebook.com/Eu.eSENS Twitter: twitter.com/eSENS_EU LinkedIn: http://www.linkedin.com/ groups/EU-eSENS-4998775 Contact us: esens.info@lists.esens.eu Visit e-SENS: www.esens.eu


Download ppt "E-SENS Electronic Simple European Networked Services eHealth Pilot Initiation Guide and Progress Monitoring."

Similar presentations


Ads by Google