New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program.

Similar presentations


Presentation on theme: "New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program."— Presentation transcript:

1 New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program

2 NEW RADON RESISTANT CONSTRUCTION Building the framework - Should we be concerned about Radon-YES.

3  NNEPA Radon Program has to follow the following:  NN Procurement Policy process.  Regional Business Development Office (RBDO)  Source List  Sole Source List BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

4  Section 164 Review Process  Department & Phone No.  Document  Brief description of attachments  Reviewers  Sponsor/Program Signature  Division Director Signature  Office of Management & Budget  Office of Attorney General  Office of the President  Legislative Counsel  Committee Chairperson  Back to O.M.B. for Administrative Implementation  Business Regulatory Dept.  Comments Section BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP Signature Approval Sheet (SAS)

5  The Instructor  Mr. Brad Turk  Environmental Bldg. Sciences, Inc.  Las Vegas, NM  Exceptional skills:  As an Instructor  People skills  Highly recommended  Workshop scheduled for August 2012 BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

6  Occupant on fixed income  No access to the crawlspace.  Install a Solar Panel to run the one fan 6 inch radon fan  Crawlspace 8 to 14 inches  No electricity at time of selection BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

7  Perfect home for radon mitigation.  Committed Homeowner  Crawlspace @ 3-4 ft.  Clean crawlspace  Solid foundation no cracks along the joints  Access to crawlspace  Install one 6 inch radon fan

8 Hogan with dirt floor, no utilities and water After includes Electricity, Water and Septic System. CONTAMINATED STRUCTURES PROJECT UPDATES

9 Before with one bedroom including utilities After three bedroom w/all utilities, water and septic system CONTAMINATED STRUCTURES PROJECT UPDATES Before After

10 6 bedroom w/utilities, water and septic system. 6 bedroom-3 bath (1 ADA) w/utilities, water and septic system. CONTAMINATED STRUCTURES PROJECT UPDATES

11 Thank you from the “Award Winning NNEPA Radon Program”.