Presentation is loading. Please wait.

Presentation is loading. Please wait.

Aleph Product Working Group Aleph PWG Business Meeting Berlin, Sept. 9th, 2013.

Similar presentations


Presentation on theme: "Aleph Product Working Group Aleph PWG Business Meeting Berlin, Sept. 9th, 2013."— Presentation transcript:

1 Aleph Product Working Group Aleph PWG Business Meeting Berlin, Sept. 9th, 2013

2 Aleph PWG Business meeting, Berlin 2013 Aleph PWG Agenda 1)Aleph v23 Enhancement Process 2)Conference Planning 3)Aleph v22 Enhancements 4)Q & A

3 Aleph PWG Business meeting, Berlin 2013 Enhancements 2013/2014 1)Detailed information about enhancements can be found in http://igelu.org/products/aleph/aleph-enhancements http://igelu.org/products/aleph/aleph-enhancements 2)Timeline for enhancements Sept. 20, 2013: NERS database is closed to new enhancement requests Sept. 21 – Oct. 12: PWGs clarify and validate requests Oct. 13 – Oct. 26: First voting period Oct. 27 – Nov. 24: ExLibris assigns development points to enhancements Nov. 25 – Dec. 29: PWGs work with ExLibris to clarify requests and pointing Dec. 30 – Jan. 17, 2014: Final voting cycle Jan. 18 – Jan. 24: PWGs select final enhancements to submit to ExLibris Jan. 25 – 30: Remove ELUNA enhancements sent to ExLibris. Jan 31: PWG submit final enhancements to Ex Libris

4 Aleph PWG Business meeting, Berlin 2013 Using NERS for ALEPH enhancements 1)New enhancements are submitted on NERS 2)Old enhancements submission should be demanded to Aleph PWG 3)NERS database is shared by IGeLU and ELUNA 4)IGeLU members can vote on enhancements submitted by ELUNA 5)In IGeLU enhancement cycle, the enhancements already accepted by ELUNA are removed from voting 6)Each member has 100 points for voting

5 Aleph PWG Business meeting, Berlin 2013 Voting for 2013 Enhancements IGeLU Aleph on NERS https://ners.igelu.orghttps://ners.igelu.org Voting opens October 13, 2013

6 Aleph PWG Business meeting, Berlin 2013 Conference planning Conference committee ≠ PWG Monthly conference calls, hundreds of emails Google Docs for collaboration Late changes and very late changes

7 Aleph PWG Business meeting, Berlin 2013 Conference planning Aleph track Berlin 2013 Networked GUI scenarios, Systems merge, Aleph Direct experiences, ARC report studio, copy-specific information in Aleph and Primo Q&A

8 Aleph PWG Business meeting, Berlin 2013 Conference planning Aleph in Alma SaaS instead of local installation from pilots to regular migration do we (want to) find our Aleph workflow?

9 Aleph PWG Business meeting, Berlin 2013 Nominations and Voting for PWG members Acquisitions/Serials (EDI) Systems Administration

10 Aleph PWG Business meeting, Berlin 2013 Enhancements approved in 2012/2013 1)40 enhancements were submitted for first voting cycle 2)The 15 most voted enhancements were selected for second voting cycle 3)The 7 most voted enhancements were selected and sent to ExLibris to be implemented in v22

11 Aleph PWG Business meeting, Berlin 2013 Q & A

12 Aleph PWG Business meeting, Berlin 2013 Question 1 We are running on ALEPH 21 with COBOL5 and rts32 is the main routine for aleph server processes and our platforms are 64-bit machines since long time. 1)Why can't we run rts64 instead of rts32 and take full advantage of our 64-bit machines?

13 Aleph PWG Business meeting, Berlin 2013 Question 2 The enhancements in Aleph 21 for more scalability (e.g. multi server topology, splitting of UE_01 in multiple processes) were really good things for big installations. However there are still some vital parts in the system, which must also be scalable. If, for example, the UE_21 can not handle the same amount of data as the UE01, there will inevitably be problems of acceptance concerning the use of Primo 1)When ue_21 job be able to run multiple processes, like ue_01?

14 Aleph PWG Business meeting, Berlin 2013 Question 3 1)Will be mandatory to re-index Aleph when migrating from v21 to v22 an there are other major time-consuming steps in the upgrade?

15 Aleph PWG Business meeting, Berlin 2013 Question 4 1)The logical "and" must be used to search several keywords in SRU search. When be available a version to use keyword search without "and"?

16 Aleph PWG Business meeting, Berlin 2013 Question 5 Session 4.1 shows the full benefits on TCO for libraries running the Aleph GUI on a Windows Terminal Server. 1)When Exlibris plan to certify Aleph GUI for 64-bits windows server (2008 and 2012), granting support for users who want to use it?


Download ppt "Aleph Product Working Group Aleph PWG Business Meeting Berlin, Sept. 9th, 2013."

Similar presentations


Ads by Google