6-3Process Selection and Facility Layout Process selection Deciding on the way production of goods or services will be organized Major implications Capacity planning Layout of facilities Equipment Design of work systems Introduction
4
6-4Process Selection and Facility Layout Key aspects of process strategy – Capital intensive – equipment/labor – Process flexibility – Adjust to changes – Design – Volume – technology Process Strategy
5
6-5Process Selection and Facility Layout Variety How much Flexibility What degree Volume Expected output Job Shop Batch Repetitive Continuous Process Selection
6
6-6Process Selection and Facility Layout Job shop Small scale Batch Moderate volume Repetitive/assembly line High volumes of standardized goods or services Continuous Very high volumes of non-discrete goods Process Types
7
6-7Process Selection and Facility Layout Flexible Manufacturing VD7 Process at Trek Bikes
8
6-8Process Selection and Facility Layout Process Overview AB2 Aluminum tubing, suppliers at Hillerich & Bradsby
9
6-9Process Selection and Facility Layout Process Type Job Shop Appliance repair Emergency room Not feasible Batch Commercial bakery Classroom Lecture Repetitive Automotive assembly Automatic carwash Continuous (flow) Not feasible Oil refinery Water purification Figure 6.2 Product – Process Matrix
10
6-10Process Selection and Facility Layout Automation: Machinery that has sensing and control devices that enables it to operate Fixed automation Programmable automation Automation
11
6-11Process Selection and Facility Layout Computer-aided design and manufacturing systems (CAD/CAM) Numerically controlled (NC) machines Robot Manufacturing cell Flexible manufacturing systems(FMS) Computer-integrated manufacturing (CIM) Automation
12
6-12Process Selection and Facility Layout Layout: the configuration of departments, work centers, and equipment, with particular emphasis on movement of work (customers or materials) through the system Facilities Layout
13
6-13Process Selection and Facility Layout Requires substantial investments of money and effort Involves long-term commitments Has significant impact on cost and efficiency of short-term operations Importance of Layout Decisions
14
6-14Process Selection and Facility Layout Inefficient operations For Example: High Cost Bottlenecks Changes in the design of products or services The introduction of new products or services Accidents Safety hazards The Need for Layout Decisions
15
6-15Process Selection and Facility Layout Changes in environmental or other legal requirements Changes in volume of output or mix of products Changes in methods and equipment Morale problems The Need for Layout Design (Cont’d)
16
6-16Process Selection and Facility Layout Product layouts Process layouts Fixed-Position layout Combination layouts Basic Layout Types
17
6-17Process Selection and Facility Layout Product layout Layout that uses standardized processing operations to achieve smooth, rapid, high- volume flow Process layout Layout that can handle varied processing requirements Fixed Position layout Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed Basic Layout Types
18
6-18Process Selection and Facility Layout Raw materials or customer Finished item Station 2 Station 2 Station 3 Station 3 Station 4 Station 4 Material and/or labor Station 1 Material and/or labor Material and/or labor Material and/or labor Used for Repetitive or Continuous Processing Figure 6.4 Product Layout
19
6-19Process Selection and Facility Layout High rate of output Low unit cost Labor specialization Low material handling cost High utilization of labor and equipment Established routing and scheduling Routing accounting and purchasing Advantages of Product Layout
20
6-20Process Selection and Facility Layout Creates dull, repetitive jobs Poorly skilled workers may not maintain equipment or quality of output Fairly inflexible to changes in volume Highly susceptible to shutdowns Needs preventive maintenance Individual incentive plans are impractical Disadvantages of Product Layout
21
6-21Process Selection and Facility Layout 1 234 5 6 7 8910 In Out Workers Figure 6.6 A U-Shaped Production Line
22
6-22Process Selection and Facility Layout Dept. A Dept. BDept. D Dept. C Dept. F Dept. E Used for Intermittent processing Job Shop or Batch Process Layout (functional) Figure 6.7 Process Layout
23
6-23Process Selection and Facility Layout Work Station 1 Work Station 2 Work Station 3 Figure 6.7 (cont’d) Product Layout (sequential) Used for Repetitive Processing Repetitive or Continuous Product Layout
24
6-24Process Selection and Facility Layout Can handle a variety of processing requirements Not particularly vulnerable to equipment failures Equipment used is less costly Possible to use individual incentive plans Advantages of Process Layouts
25
6-25Process Selection and Facility Layout In-process inventory costs can be high Challenging routing and scheduling Equipment utilization rates are low Material handling slow and inefficient Complexities often reduce span of supervision Special attention for each product or customer Accounting and purchasing are more involved Disadvantages of Process Layouts
26
6-26Process Selection and Facility Layout Cellular Production Layout in which machines are grouped into a cell that can process items that have similar processing requirements Group Technology The grouping into part families of items with similar design or manufacturing characteristics Cellular Layouts
27
6-27Process Selection and Facility Layout DimensionFunctionalCellular Number of moves between departments manyfew Travel distanceslongershorter Travel pathsvariablefixed Job waiting timesgreatershorter Throughput timehigherlower Amount of work in process higherlower Supervision difficultyhigherlower Scheduling complexityhigherlower Equipment utilizationlowerhigher Table 6.3 Functional vs. Cellular Layouts
28
6-28Process Selection and Facility Layout Warehouse and storage layouts Retail layouts Office layouts Other Service Layouts
29
6-29Process Selection and Facility Layout Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements. Design Product Layouts: Line Balancing
30
6-30Process Selection and Facility Layout Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit. Cycle Time
31
6-31Process Selection and Facility Layout Determine Maximum Output
32
6-32Process Selection and Facility Layout Determine the Minimum Number of Workstations Required
33
6-33Process Selection and Facility Layout Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements A Simple Precedence Diagram a b cd e 0.1 min. 0.7 min. 1.0 min. 0.5 min.0.2 min. Figure 6.10 Precedence Diagram
34
6-34Process Selection and Facility Layout Arrange tasks shown in Figure 6.10 into three workstations. Use a cycle time of 1.0 minute Assign tasks in order of the most number of followers Example 1: Assembly Line Balancing
35
6-35Process Selection and Facility Layout Workstation Time RemainingEligible Assign Task Revised Time Remaining Station Idle Time 11.0 0.9 0.2 a, c c none ac-ac- 0.9 0.2 21.0bb0.0 31.0 0.5 0.3 de-de- de-de- 0.5 0.3 0.5 Example 1 Solution
36
6-36Process Selection and Facility Layout Efficiency = 1 – Percent idle time Calculate Percent Idle Time
37
6-37Process Selection and Facility Layout Assign tasks in order of most following tasks. Count the number of tasks that follow Assign tasks in order of greatest positional weight. Positional weight is the sum of each task’s time and the times of all following tasks. Some Heuristic (intuitive) Rules: Line Balancing Rules
38
6-38Process Selection and Facility Layout cd abe fgh 0.2 0.3 0.80.6 1.00.40.3 Example 2
39
6-39Process Selection and Facility Layout Station 1Station 2Station 3Station 4 ab e f d g h c Solution to Example 2
40
6-40Process Selection and Facility Layout 1 min.2 min.1 min. 30/hr. 1 min. 60/hr. 30/hr. 60/hr. 1 min. 30/hr. Bottleneck Parallel Workstations
41
6-41Process Selection and Facility Layout Information Requirements: 1. List of departments 2. Projection of work flows 3. Distance between locations 4. Amount of money to be invested 5. List of special considerations 6. Location of key utilities Designing Process Layouts