Learning Objectives To understand some of the issues raised by Inter-Basin Water Transfers. To see how issues can be used in an ‘assess’ question.

Similar presentations


Presentation on theme: "Learning Objectives To understand some of the issues raised by Inter-Basin Water Transfers. To see how issues can be used in an ‘assess’ question."— Presentation transcript:

1 Learning Objectives To understand some of the issues raised by Inter-Basin Water Transfers. To see how issues can be used in an ‘assess’ question.

2 Assess the extent to which plentiful supplies of water in some parts of the world can be used to make up shortages elsewhere. (15 marks) Key points: scale; within/between countries; +ve/-ve; winners/losers etc ASSESS!! Why?

3 Water transfers- a quick fix? More water Solves existing demand leads to greater use Development demands Rising megacities and Industrial growth tourism especially golf courses Improved human health Agricultural demands Encourages unsustainable irrigated farming by agri- business Pollution Pollution from nitrate eutrophication and salination Transfers pollution from original river to new location Ecosystem destruction Receiving area Less water Leads to reduced use by locals, may increase poverty Ecosystem changes Degradation/ destruction Less functioning Less productive Pollution Less dilution More concentration of pollutants More silt Source area Examples of existing schemesProposed schemes I nternational Lesotho to South Africa: Lesotho Highlands Water Project Turkey to Israel by tanker National: Snowy Mountains-Australia Melamchi Nepal Tagus-Mercia Spain International Turkey to Israel undersea pipelines Austrian Alps to Spain + Greece by pipeline National: South-North transfer- China Ebro -Spain Ob to the Aral Sea NAWAPA Alaska to California

4 Beijing Tianjin Eastern Route 1,155km long diversion Central routes 1267 km diversion. May have to use some water from 3 Gorges reservoir to help Western Routes Work starts 2010, at high altitude, very difficult 500kms at 3- 5000m above sea level Demand from industrial centres, high population density and intensive agriculture. Low rainfall and over abstracted groundwater: physical scarcity Externalities Industrial growth along routeways will exacerbate existing pollution problems Changes in water balances: reduced water in Yangtze means less dilution and more pollution Displaced people especially from Dang Jiang Kou dam...... Yellow River Yangtze River South China Sea CHINAShanghai 0 mls 250 Mega Tech Fixes: China’s South–North water transfer Originally planned 1952, started 2002,due to finish 2050. Chief player: Government sponsored ‘South to North Water Transfer Project Company, with each province having a local water company. Involves huge civil engineering works, 3 major canals, pipelines, tunnels, pumping stations One of the largest water transfers globally. Aim: to divert 45bn m3/year from the water surplus river basins of the S and E to the water deficit areas of the North, especially Beijing and Tianjin

5 Inter-Basin Water Transfers (I BT) A multi billion Euro scheme designed to divert water from Spain's rainy north to it's parched south is dividing the Spanish nation.

6 Water flowing south Vicente Sicilia's company exports 60 million kilos of tomatoes, peppers, cucumbers and celery each year, much of which ends up in British supermarkets. To him the Spanish government's National Hydrological Plan makes perfect sense. "Here in Murcia we've got a wonderful climate, good land and hard working people. There's just one thing missing - water". The Spanish government says the water is needed for the agribusiness sector that covers much of southern Spain in a sea of polytunnels and plastic sheeting.

7 Water flowing south The idea is to siphon off "excess water" from the River Ebro, which springs in the Pyrenees and ends just south of Barcelona. It involves building 118 dams and more than 1000km of canals and pipelines with an estimated price tag of 18bn Euro. One third of the money is supposed to come from European taxpayers.

8 The plan has been stopped! The Spanish government's announcement is good news for the wetlands of the Ebro Delta "We have stopped the water transfer, but still have threats from the basin plan" —Dr Carles Ibañez, SEO/BirdLife

9 Tasks Two groups – one studying the Tagus-Segura IBT in Spain, one studying the Lesotho Highland Water Project in southern Africa. Each pair has information about the case study, which needs to be summarised. For example – positive/negative impacts; winners/losers - and then contribute to a group discussion about your findings. Each person will need an overall summary of the case study eg on A3. You will then be paired with a pair from the other group and you will teach each other about your case study. Water Transfer scheme What is being done Positives/NegativesWinners/Losers The Tagus – Segura Transfer, Spain The Lesotho Highland Project, Southern Africa

10 Summary What common issues arise with Inter-Basin Water Transfers? Are they a better solution than dams?