Presentation is loading. Please wait.

Presentation is loading. Please wait.

HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory.

Similar presentations


Presentation on theme: "HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory."— Presentation transcript:

1 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services steven.mcdonald@triumf.ca Canada’s National Laboratory for sub-atomic physics Located in Vancouver, Canada (west coast) ~ 400 Full Time Staff & Physicists 2 nd furthest T1 site from CERN ~168ms RRT

2 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald ** * * * * * * * * * * Centre - CountryALICEATLASCMSLHCbMB/s ASCC - TaipeiXX110 CNAF - ItalyXXXX220 PIC - SpainXXX200 CC-IN2P3 - FranceXXXX220 FZK - GermanyXXXX220 RAL - EnglandXXXX220 BNL –United StatesX154 FNAL – United StatesX50 TRIUMF - CanadaX75 NIKHEF - NetherlandsXXX175 NORDIC GRIDXXX90 # TIER1 Sites 6 10 7 71,600 TRIUMF Assumes all ATLAS T1 are equal

3 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF-CERN 1GbE Lightpath(s) TRIUMF BCNET CANARIE SURFnet CERN 1 st dedicated GbE circuit established April 18 th 2005 2 nd dedicated GbE circuit established July 19 th 2005

4 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald SC3 throughput results over 2 x 1G lightpaths TRIUMF 90-140 MB/s is typical

5 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Sept 1 ‘05 3 rd week Sept ‘05 End Oct ‘05 Amsterdam

6 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald CWDM & Lightpaths at TRIUMF /CA*net4 10 GbE @1550nm - CERN T0 2x 1 GbE @1530nm - Canada T2’s 2x 1 GbE @1510nm - ? T2 & T1 2x 1 GbE @1690nm - CAnet4 research Aug 2002 TRIUMF Local loop to Gigapop & CA*net4 PoP ~ 22km

7 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF WAN CWDM Equipment BCNET 22km 10GbE Foundry Switch -> CERN MRV CWDM 1610 nm 1590 nm 1570 nm 1550 nm Potential to Add 2 more 1GbE channels Single Pair Fiber 4 1GbE channels Passport 8600 ORAN WESTGRID 2x CERN SFP 4 Port Optical Mux 2x GbE TDM

8 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald ATLAS Tier2 in Canada TRIUMF Tier 1 Eastern Tier2 CERN TIER 0 10G 1G Dedicated e2e Lightpaths Can be lightpaths or on the routed 1Gbps CA*net4 research network ~ ? SARA/NIKHEF Tier 1 There will be two Tier 2’s Centres in Canada, one in the East and one in the West. Each centre will be a distributed across several sites, with one contact point Western Tier2 1G Tier2’s

9 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF Tier1 → Canada Tier2’s Participating Canadian Tier2 sites in SC3 Western Tier2’s Simon Fraser University University of Alberta University of Victoria Eastern Tier2’s University of Toronto T1-T2 network activity Aug 17 - Aug 24 : All four Tier 2 sites participating Already linked via a $40M Distributed Computing Grid Infrastructure Plans are underway to include Victoria in an expanded grid

10 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Transfer results over 10GbE circuit

11 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald

12 10 GbE Lightpath to CERN Summary TRIUMF CERN Atlantic Crossing √√√√√√ X X √

13 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald ATLAS Tier1 resources distribution Tier 1 Center% of pp Resources ASGC7.7 BNL24 CNAF7.5 FZK10.5 IN2P313.5 PIC5.5 RAL7.5 TRIUMF5.3 NDGF5.5 ATLAS T1-T1 Peering FZK & IN2P3BNL CNAFRAL NIKEF/SARATRIUMF & ASGC NDGFPIC TRIUMF ~.6T1 original networking specification called for ~75 MB/sec per ATLAS T1 with x6 safety factor implies 3.6 Gbps For TRIUMF T1 ~2-3 Gbps Consider 10G LAN Phy/SONET mapping Transatlantic 10G link

14 HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald 1G HEPnet daisy chain routed TRIUMF partitions APN and establishes cross connects with 3 rd parties APNs UoToronto Physics Tier 2 UoVictoria Physics Tier 2 TRIUMF Tier 1 CERN Tier 0 Amsterdam New York Chicago Toronto Vancouver Victoria FERMI Tier 1 Brookhaven Tier 1 UBC Physics UA Physics UoT Physics Carleton Physics UdM Physics CA*net 4 Edmonton Ottawa To other physics users at smaller universities Geneav CWDM 1G Tier 2 East Optional interfaces Note: Typical View on TRIUMF UCLP GUI 1G Tier 2 West 5G Tier 0 data 2G Tier 1 data


Download ppt "HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory."

Similar presentations


Ads by Google