Presentation is loading. Please wait.

Presentation is loading. Please wait.

Enterprise Resource Planning(ERP)

Similar presentations


Presentation on theme: "Enterprise Resource Planning(ERP)"— Presentation transcript:

1 Enterprise Resource Planning(ERP)
PREPARED BY:- Bhadeshiya Sagar(09it056) Manavar Vishal(09it155) Akbari Hardi(09it156) GUIDED BY:- Prof. R.N.Kotecha

2 SCOPE Possible Modules: Project management and control
Onsite engineering management Quality control and assurance Warehouse management Finance management Sales and customer management Estimation Contract billing Plant and machinery management CRM Payroll Employee management Stores management Order management Purchase management Workflow etc

3 SCOPE (continued…) Project scope limited to:
1. Human resource management 2. Production management 3. Sales management

4 USE CASE DIAGRAM - GENERAL

5 USE CASE DIAGRAM - HR MANAGEMENT

6 USE CASE DIAGRAM - PRODUCTION MANAGEMENT

7 USE CASE DIAGRAM - SALES MANAGEMENT

8 ACTIVITY DIAGRAM - HR MANAGEMENT

9 ACTIVITY DIAGRAM - PRODUCTION MANAGEMENT

10 ACTIVITY DIAGRAM - SALES MANAGEMENT

11 SEQUENCE DIAGRAM - HR MANAGEMENT

12 SEQUENCE DIAGRAM - PRODUCTION MANAGEMENT

13 SEQUENCE DIAGRAM - SALES MANAGEMENT

14 CONTEXT DFD

15 DFD 0

16 DFD 1 for PRODUCTION MANAGEMENT

17 DFD 1 for SALES MANAGEMENT

18 SRS 1.Software Requirements Language : C# Database : Microsoft SQL server 2008 Editor : Microsoft Visual Studio 2010 Operating System : Windows XP Documentation : Microsoft office 2007

19 SRS (continued…) 2.Hardware Requirements Processor : Pentium 4 onwards
Processor Speed : 1 GHz RAM : 512MB Hard Disk : 80GB Keyboard : 104 keys

20 SRS (continued…) 3.System Users: There are two types of user dealing with the system: A. Administrator Admin is having all the rights on the application. B. Employee Emp uses facilities offered by the software like managing sales, ask for updates in details etc.

21 SRS (continued…) 4.Constraints of system: General Constraints
This system will not take care of any virus problem that might occur on the computer with which it is installed. Recovery of data after a system crash will not be possible . Manual interfaces cannot be fully avoided.

22 SRS (continued…) Hardware Constraints
The performance of the system will be dependent on the machine conditions. The space required to store the data would increase as more and more records are added to the system. Data Constraints Serial number will be of 20 characters with Wo_no at first and financial year at last.

23 SRS (continued…) Time Constraints
The system is confined to be completed in less than 11 months. Team is also small, which made it even more challenging. This team only has 3 persons.

24 SRS (continued…) 5.Assumptions and Dependencies
It is assumed that the user is familiar with the basic computer fundamentals. Removable media should be scanned for viruses before use. It is assumed that the maintenance of the database will be assigned to the authorized person only. Only authorized persons will be allowed inside the system.

25 REFERENCES www.ibm.com/developerworks/topics/sequence%20diagram/


Download ppt "Enterprise Resource Planning(ERP)"

Similar presentations


Ads by Google