Project Goldberg Tyler Pannell Lee Wennerstrom Erica Carrico
2
OPERATION “DRIFTWOOD”
3
PROCESS STEP 1: PARALLEL INCLINE RAMPS 1 st ramp 2 nd ramp [Same equations as 1 st ramp]
4
STEP 3: BALL AND PULLEY I) II) III) IV) STEP 4: BLUE CAR RELEASED
5
STEP 5: CAR COLLISION W/HEART STEP 6: AMBULANCE RELEASED MAKE ORANGE green!
6
Cost Estimate ITEMPRICE Skill Sticks$1.00 Mini Glue Gun$2.59 Glue Sticks$1.89 Large Wooden Heart$0.69 Balsa sheets$1.99 Dowel$1.39 Clothes Pins$1.99 Cardboard$0.50 Used soda can$0.05 Toy cars (x2)$1.94 Revolutionary on a Horse$1.49 Rubber bands$0.10 Stress balls bought in S. Korea (~5000 Won)$4.31 Total:$19.93
7
A lot of energy was expended uselessly during the making of this device. No animals were harmed in the process.