Presentation is loading. Please wait.

Presentation is loading. Please wait.

International Atomic Energy Agency 1 Opening free access to the INIS DB and NCL Part 1 The 34 th Consultative Meeting of INIS Liaison Officers Vienna,

Similar presentations


Presentation on theme: "International Atomic Energy Agency 1 Opening free access to the INIS DB and NCL Part 1 The 34 th Consultative Meeting of INIS Liaison Officers Vienna,"— Presentation transcript:

1 International Atomic Energy Agency 1 Opening free access to the INIS DB and NCL Part 1 The 34 th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008

2 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 2 INIS Membership Arrangements (exclusive rights of ILOs, cost and price of products) INIS Information Letter No. 137 “Distribution Policy of full-text of INIS non-conventional literature” INIS Technical Note No. 166 “INIS Liaison Officer’s Authorisation for Online Access to the documents submitted by their Centre to the INIS NCL Collection”

3 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 3 Current subscription rules Paid 1.4 Research centres, laboratories: Paid1.3 Commercial company Free1.2 University Paid1.1 Single user 1.5 INIS Centres + Free

4 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 4 Current subscription statistics Free subscribers including 374 universities 535 Paid subscribers 15 Active users~20,000 Individual registrations 3,676

5 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 5 INIS Membership Arrangements 3.1.5.1 Cost and Price of Products Full recovery of the entire INIS budget through the sale of products and services to Member States cannot be expected, because these Member States already contribute to the Agency budget (and hence to INIS), and additionally incur expenses themselves in providing input to the system.

6 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 6 Manual (resource consuming) On individual basis At the level of organisation (by IP address) No information about particular user No mechanism to ‘deliver’/contact each user Current registration procedure

7 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 7 Automatic registration of any user of particular country (if allowed by national ILO) IP address is used only for country recognition All users have to be registered information about particular user each user can be contacted directly easily each user can customise interface … Proposed registration procedure

8 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 8 Many bibliographic databases available on the Web are free Number of databases with free access are growing up Majority of internet users prefer simple and direct registration procedure … Additional pros

9 International Atomic Energy Agency 34th Consultative Meeting of INIS Liaison Officers Vienna, 3 – 5 November 2008 9 Discussed and recognised the imprtance of opening free access to the INIS Database on the Internet including access to NCL full-text documents which are non- restricted Recommended to start with a pilot project with limited number of countries to find/elaborate optimal technical and organisational model/solution Stated that the implementation of the free access has to be done on country by country basis, taking into account exclusive rights of ILOs 11 th INIS-ETDE Joint Technical Committee Meeting


Download ppt "International Atomic Energy Agency 1 Opening free access to the INIS DB and NCL Part 1 The 34 th Consultative Meeting of INIS Liaison Officers Vienna,"

Similar presentations


Ads by Google