Presentation is loading. Please wait.

Presentation is loading. Please wait.

International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol.

Similar presentations


Presentation on theme: "International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol."— Presentation transcript:

1 International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol

2 Monitoring Site Rampur Kathmandu

3 Country:Nepal Location:Institute of Agriculture and Animal Science, Rampur, Chitwan Site type: Rural site, 15 km south of the Royal Chitwan National Park Latitude:27 O 38’ 52.8” N Longitude:84 O 20’ 47.7” E Altitude:165 mamsl Monitoring Site

4 Regular monitoring Transboundary Air Pollution monitoring station – Rampur, Chitwan Emission inventories 2005 – Nepal Rapid Urban assessment – Kathmandu City report finalized Health Impact Assessment Crop Impact Assessment (2nd field assessment) Activities in Phase IV

5 Transboundary Air Pollution Monitoring Station

6 Instruments Passive Sample High Volume Sampler Automatic Weather Station

7 Instruments Wet Only Collector Bulk Collector Laboratory

8 High Volume Sampler PM 10 RSPMTSP Passive Samples: SO 2 NO 2 O 3 Rain Water Chemistry (Wet and Bulk rain): Rain Water volume, pH, Conductivity, Temperature, Calcium Hardness, Magnesium Hardness, Chloride, Sulphate, Potassium, Sodium, Ammoniacal-Nitrogen, Nitrate-Nitrogen Regular Monitoring Parameter at IAAS, Rampur

9 Water Chemistry Analyze method: ParameterAnalyze method Rain Water volume-Measuring cylinder pH- pH meter Electric Conductivity-Conductivity cell Temperature-“ Calcium Hardness-Titrimetry Magnesium Hardness-“ Chloride-“ Potassium-AAS Sodium-“ Ammoniacal-Nitrogen-Distillation Sulphate-Spectophotometry Nitrate-Nitrogen-“

10 Results Passive sample- Rampur, Chitwan

11 High Volume Sample – Rampur, Chitwan Instrument failure

12 Water Quality - Bulk collector

13 Data: mid 2007 to 2011

14 Water quality - Wet only collector Data: mid 2007 to 2008

15 2 nd water quality comparison

16 Reports - Rapid Urban Assessment - Health Assessment

17 2nd Crop Impact Assessment

18 Emission inventory- 2005, Nepal

19 Corrosion Study Main Rack ?

20 Challenges and difficulties  Electricity reliability (up to 12-18hrs power cut) - back up system  Instrument failure-time to maintenance  Resolve instrument failure -lack of knowledge on instrument  Political situation-staff change/shift, Strike, blockage

21 Thank you


Download ppt "International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol."

Similar presentations


Ads by Google