Presentation is loading. Please wait.

Presentation is loading. Please wait.

Carlton Elementary School – Salem MA. Outside front entrance.

Similar presentations


Presentation on theme: "Carlton Elementary School – Salem MA. Outside front entrance."— Presentation transcript:

1 Carlton Elementary School – Salem MA

2 Outside front entrance

3 Outside front view

4 Marine/wave motif repeated in school

5 Science room

6

7 Passage to greenhouse

8 Touch tank

9 Control panel & Batteries for photovoltaics, wind turbine

10 Greenhouse Photovoltaics on roof glazing Main banks on roof

11

12 Gymnasium Illuminated by natural light Prismatic skylights capture ambient light No lights on!

13

14 Lights in corridor minimize glare Note wave design in floor

15 Audicafeterium

16

17 Teachers room Most support rooms were kept in middle of building Classroom has windows –support rooms do not Exception - Admin wing is next to front door

18 Roof painted white to limit heat absorption

19 Light-collecting skylights for gym

20 Wind turbine Demonstration project only

21 Photovoltaic array

22

23 Front entry

24 Front entry – second level

25 Kindergarten room

26 Library

27 Carlton E-School - 2004 Replaced outdate poorly- constructed/designed 1952 school Capacity: 250 K-Grade 5 plus pre-school (Headstart) Enrollment: 250 kids (150 are city Headstart) Construction cost: $9 million

28 Green innovations Automatic room lights Light collecting skylights Double-glazed windows Photovoltaics Wind turbine Recyclable lunch materials MTC funding SBA refund – 90% of construction cost


Download ppt "Carlton Elementary School – Salem MA. Outside front entrance."

Similar presentations


Ads by Google