Presentation is loading. Please wait.

Presentation is loading. Please wait.

Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American.

Similar presentations


Presentation on theme: "Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American."— Presentation transcript:

1 Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American Evaluation Association/Canadian Evaluation Society Joint Conference Toronto, Canada October 28, 2005 Scott Albert, GDS Associates Helen Kim, NYSERDA Rick Ridge, Ridge & Associates Gretchen B. Jordan, Sandia National Laboratory

2 2 The NYSERDA Portfolio

3 3 R&D Budget Through 12/31/04

4 4 Objective Develop and pilot-test an evaluation model for NYSERDA’s R&D program area covering 1998 through 2004 that recognizes: – R&D programs and their societal impacts are difficult to evaluate by their nature. – The outcomes are subject to multiple and uncontrollable influences that are difficult to foresee. – The cycle for product development is 5 to 15 or 20 years and many of the energy and economic impacts of R&D projects may not be fully realized and measured for many years. – Given the multiple and compounding effects that happen along the way, it is also very difficult to be exact about the attribution of impacts to any one particular effort. – When evaluating an entire portfolio of R&D projects, objectives and outcomes vary by project.

5 5 R&D Portfolio Logic Model

6 6 Six Stages of the R&D Model Information for policy makers and R&D community Product development stage 1 – study and prove concepts Product development stage 2 – develop new or improved products Product development stage 3 – product testing Demonstration Pre-deployment

7 7 The Value/Cost Method Combines Two Approaches Aggregate approach – Analyzed data collected for each of NYSERDA’s 638 R&D projects (since 1998) in the portfolio. – Basic statistics, such as the number of projects, expenditures by technology type, leveraged funds, and the stage of development were calculated to describe the entire R&D portfolio. Peer Review – Analyzed using an adaptation of the Composite Performance Rating System (CPRS) used to evaluate the U.S. Department of Commerce’s Advanced Technologies Program (ATP). – Peer review approach was applied to a small sample of successful R&D projects, covering each of the six R&D stages (project types).

8 8 ATP: Composite Performance Rating System Constructed Bottom-up; Used Top-down Performance Distribution for the Portfolio Distribution by Tech Area Distribution by Firm Size Distribution by Location etc. Project 1 Case Study Project 2 Case Study Project 3 Case Study Project 4 Case Study Project n Case Study... Unique cases Aggregate statistics Composite scores Performance distributions Minimum net portfolio benefits CPRS 1CPRS 2CPRS 3CPRS 4CPRS n ATP Method R.Ruegg, Nov. 2002

9 9 AGGREGATE ANALYSIS Expanded and updated R&D database in order to carry out a comprehensive descriptive analysis of the entire R&D portfolio. Variables Considered – Funding – Technology Area – Co-Funding Entity – Project Status – Expected Benefits from R&D Projects

10 10 Questions Addressed by Aggregate Analysis How does NYSERDA funding per project vary by project type? How does NYSERDA funding per project vary by program? What is the frequency of the various project types? What goals are being served by the various project types? What are the primary goals served by the portfolio? What are the sources of funding, by project type? What is the funding share contributed by partners? How does NYSERDA funding and co-funding vary by project type over time? How does the mix of technologies and issues examined change over time?

11 11 Results: Aggregate Analysis

12 12 NYSERDA Funding, by Project Type

13 13 Funding by Goals

14 14 Co-Funding Sources

15 15 Percent of Projects by Technology and Year

16 16 Peer Review Focused on Six Success Stories as a Pilot Test

17 17 Indicator Variables Choice of indicator variables for the R&D portfolio guided by the R&D portfolio logic model. Six categories of outcomes, identified in the logic model were selected: – Knowledge creation, – Knowledge dissemination, – Commercialization progress, – Energy benefits, – Economic benefits, and – Environmental benefits.

18 18 Accomplishment Packets Project-specific accomplishment packets were then developed to document objective evidence regarding the six outcomes: – Knowledge creation – Knowledge dissemination – Commercialization progress – Realized and potential energy benefits – Realized and potential economic benefits – Realized and potential environmental benefits – Value versus cost (not a specific outcome, but this item was also included in the peer-reviewer response packet for 0 to 4 rating)

19 19 Review Process Reviewers willing to participate were sent: – Peer Review Instructions, – Conflict of Interest Form – Peer Review Assessment Form, and – the Peer Review Information Packet for their specific project. Over a period of five weeks, the reviewers completed their assessment and returned them for data entry.

20 20 Results: Peer Review

21 21 Weighted Rating By Project

22 22 Overall Ratings by Outcome

23 23 Overall Ratings, by Project, by Outcomes

24 24 Conclusions: Aggregate Analysis Assumes more risk than the commercial sector in the earlier stages of technology development, while in the latter stages, the reverse is true. Covers a wide range of technologies that are aimed at achieving potentially significant energy, economic and environmental benefits. Leverages funds on a 4.3 to 1 ratio. Partners with a wide range of public and private organizations and institutions. Evolves over time in response to the societal needs and opportunities to address them (i.e., the technologies and issues addressed in the R&D portfolio are not static).

25 25 Conclusions: Peer Review Peer review scores from the pilot test averaged 3.34 (on a 0-to-4 scale) across all assessment categories. There are substantial benefits across all documented accomplishment areas for the five projects assessed. Significant progress is being made toward the eventual achievement of measurable 3-E benefits.

26 26 Conclusions: Peer Review Process The information provided in the review packets for the five selected projects was adequate The instructions provided were clear The criteria used in the assessments were clearly defined The criteria used in the assessments were the right ones It is very important for NYSERDA to assess the value of its R&D programs The results of the peer review process should be useful for NYSERDA decision-makers Reviewers can assess a fair amount of information if the information is presented in a clear and organized format. Statistical analyses revealed that the ratings provided by the peer reviewers were reliable.

27 27 Next Steps Routinize the collection of key indicator data for all R&D projects. Perform aggregate analysis on all projects Focus significant effort on a more representative sample of projects


Download ppt "Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American."

Similar presentations


Ads by Google