Presentation is loading. Please wait.

Presentation is loading. Please wait.

Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05.

Similar presentations


Presentation on theme: "Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05."— Presentation transcript:

1 Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05

2 Bright SCC signs grace the front yards of all our schools

3 Tatem Classroom Classroom New Unit Ventilator

4 Tatem Exterior Brick Re-pointing

5 HMHS A Wing Classroom Renovation

6 HMHS B Gym Access to new heating units on roof to be installed in this opening.

7 Central-Middle School Roof Work

8 Middle School Classroom New Unit Ventilator to be installed

9 Middle School Gym Floor Old Surface Removal

10 Middle School Restroom Renovation

11 Central School Classroom This classroom is getting a new unit ventilator installed.

12 Elizabeth Haddon Restroom This group restroom is ready for new fixtures.


Download ppt "Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05."

Similar presentations


Ads by Google