Presentation is loading. Please wait.

Presentation is loading. Please wait.

 Design-Build  Design-Bid-Build (Single/Multiple Prime)  Unit Price Contract (UPC)

Similar presentations


Presentation on theme: " Design-Build  Design-Bid-Build (Single/Multiple Prime)  Unit Price Contract (UPC)"— Presentation transcript:

1

2  Design-Build  Design-Bid-Build (Single/Multiple Prime)  Unit Price Contract (UPC)

3 Delivery MethodCIP1CIP2 Total CIP % Total CIP Design-Build$70 M$342 M$412 M 60.32% Design-Bid-Build (Single/Multiple Prime)$182 M$79 M$261 M 38.21% Small Projects Under the Bid Limit$0 M$4 M 0.58% Unit Price Contract$3 M $6M$6M 0.89% Total Construction Projects$255 M$428 M$683 M Total Non Construction Projects$76 M$74 M$150 M Total Projects$331 M$502 M$833 M *Dollar values reflect total project cost

4 CIP Cost% CIP CostNumber of Projects PLA Projects $610 M 90%50 Other $73 M 10%*167

5  Characteristics of PLA projects › Large, long duration › Complex, multiple trades › No work stoppages  Characteristics of other projects › Small, short duration › Single or few trades › Local, emerging firms › Flexible, agile, expedient

6 http://smccd.edu/facilities/


Download ppt " Design-Build  Design-Bid-Build (Single/Multiple Prime)  Unit Price Contract (UPC)"

Similar presentations


Ads by Google