Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network.

Similar presentations


Presentation on theme: "1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network."— Presentation transcript:

1 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network Richard C. Lockwood Chief, Operations Division U.S. Army Corps of Engineers, Pittsburgh District

2 RIVERS INFORMATION SERVICE RIS GOALS RIS will be an electronic system that will pull data from various existing sources both Government and commercial and process and display that information in customizable user friendly formats Modify or replace existing USACE systems to achieve a single system that will inform and be informed by the systems already in use by our navigation partners. Use existing layered GIS based technology, Electronic Navigation Charting and data summarizing to provide all partners with the specific information they need to staff, operate and use the Inland Navigation system. Eliminate duplication of data entry and ensure seamless transfer between USACE systems and Navigation and Government partners.

3 3 Generate confidence both within and outside USACE that RIS is a valuable tool that will improve operational reliability of the system while reducing data entry requirements and costs. RIS will use existing technology, Electronic Navigation Charting and data summarizing to provide all partners with the specific information they need to staff, operate and use the Inland Navigation system. RIS will eliminate duplication of data entry and ensure seamless transfer between USACE systems and Navigation and Government partners. RIS will generate confidence both within and outside the Government that the Inland Waterways System is an efficient, safe and reliable transportation system.

4 4 CONSTRAINTS RIS must protect sensitive and proprietary information of the commercial Navigation partners. RIS must fit seamlessly into the bigger CRIS service and use existing standards for data coding and classification RIS must be capable of informing and being informed by USCGs AIS (Automated Identification System) and other existing commercial systems for tow tracking and scheduling RIS must be capable of informing and being informed by other USACE systems (Asset Management, OMBIL, CWMS, etc) and other Partner systems (NWS, USGS, IRS, Customs, etc.) Navigation data (current, wind speed, lock condition, gauge readings, dam operating data, etc.) provided via or by RIS must not expose USACE to any liability concerning the use of that data.

5 5 CURRENT DATA COLLECTION Lock Operators receive hard copy information from deckhand on the tow and then manually enter the data into OMNI or LPMS. (2 systems) OMNI/LPMS require 123 Different Items to be entered Result is some simplification –Barge tonnage information is not accurate. –Not every jumbo barge has 1500 tons Facilities are not getting credit for the tonnage they pass each year. Lower tonnage means lower funds The Corps have teams of personnel reconciling the OMNI data with the Monthly Commodity Reports submitted to the IRS & Department of Commerce by Industry. The data is inaccurate and unreliable.

6 6 Lockage Work Area Times and Stall Information

7 7 Lockage Work Area Barge Information

8 8 Weather Work Area Entered every three hours

9 9 Readings Work Area Gage information entered every hour or after a dam gate move

10 10 Readings Work Area Individual dam gate levels are recorded

11 11 RIS TOWING VESSELS USACE ASSET MANAGEMENT LOCK LOCAL DATA SYSTEM DATA TOWING COMPANIES TERMINAL OPERATORS PORT AUTHORITIES SHIPPERS USCG AIS OMBIL NATNL WEATHER SER USGS RECREATIONAL BOATERS CWMS IRS DHS RIVER INFORMATION SERVICE CUSTOMS DOE

12 12 STRATEGY LEVERAGE WORK OF PIANC WG 125 TO CREATE A NEW INFORMATION SYSTEM –USE EXISTING INFORMATION –CUSTOMIZABLE DATA DISPLAY FOR ALL USERS –UTILIZE MARINE INFORMATION OVERLAYS –ELIMINATE MULTIPLE DISPLAYS REPLACE OMNI/LPMS WITH LOMA (LOCK OPERATION MANAGEMENT) –NO MANUAL DATA INPUT –AUTOMATIC CAPTURE OF REAL TIME DATA AT LOCK –ELIMINATE REDUNDANT AND CONFLICTING SYSTEMS

13 13 Hydrographic Overlay The latest data provides a clear view of the channel and river bottom contours.

14 14 AIS Overlay

15 15 RADARSAT Overlay

16 16 Lock Queue Overlay

17 17 Connected SMART LOCK OVERLAY

18 18 Environmental Data Overlay

19 19 Real Time Current Velocity (RTCV) Overlay

20 20 FIRST MEETING OF US NATIONAL RIS TEAM 15 JULY 2009 ENDSTATE, GOALS AND INITIATIVES DEFINED MARK STEVENS VP @ INGRAM BARGE HAS PILOTHOUSE PROTOTYPE JIM McCARVILLE / PORT OF PITTSBURGH COMMISSION AND CMU STUDENT PRACTICUMS –SMARTLOCK –RIVER NET –WIRELESS WATERWAYS CURRENT INITIATIVES

21 21

22 22 Questions?


Download ppt "1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network."

Similar presentations


Ads by Google