IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly area and Class Rooms 2. Church Office and Meeting rooms 3. Parsonage for Pastors 4. Multipurpose Hall The Building project has been taken up in 2 phases Phase 1 – Main Building – Ground + 3 floors ( 4000 Sft/ floor) – Total 16,000 sft Phase 2 - Toilet Block / Stores etc
3
JULY 2011 THE IDEA OF A NEW MULTI PURPOSE BUILDING BUILDING PLAN APPROVALMAY 2012 FINAL DESIGN NOV 2012
4
GROUND BREAKING CEREMONY BY Bishop Dr.Taranath S Sagar On 3 rd March 2013
5
AN ARTIST’S IMPRESSION OF THE BUILDING
6
EXISTING CHURCH SILVER JUBILEE BLOCK Phase-1 T O I L E T B L O C K Ph2 TEMP SUNDAY SCHOOL BLOCK TEMP CHURCH OFFICE TEMP TOILET BLOCK EXISTINGLAWNEXISTINGLAWN PLAN OF THE NEW BUILDING – Phase 1 & Phase 2
7
GROUND FLOOR PLAN DRIVE WAY TOILET(G)TOILET(L)STORESPANTRY MEDICAL/ NURSING TRANSFORMER SECURITY PORTICO Ground Floor will consist of CAR PARKING, TOILETS, etc.
8
FIRST FLOOR PLAN MULTI PURPOSE HALL SUNDAY CLASS STORES BALCONY SUNDAY CLASS STAGE GREEN ROOM HALL CAPACITY - 300 ( appx), Will be used by SS, Church services ( Virtual Church), VBS programs, retreats, seminars, functions etc.
9
SECOND FLOOR PLAN BALCONY OPEN TERRACE CONFERENCE TOILETS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS/ BREAK OUT SUNDAY CLASS/ BREAK OUT ASSO PASTOR SENIOR PASTOR JR. PASTOR VISITORS OFFICE Sunday School Block, Church offices, Meeting/ Conference rooms etc.
10
THIRD FLOOR PLAN BALCONY OPEN SPACE KITCHEN DINING BED ROOM LIVING SENIOR PASTOR’s HOUSE ASSO. PASTOR’s HOUSE LIVING DINING KITCHEN BED ROOM Parsonage – Senior Pastor / Asst. Pastor
11
TERRACE FLOOR PLAN Open terrace – Planned a temporary roof at a later stage and can be used for functions etc. Capacity – 400 ( appx)
12
SALIENT FEATURES PRE S * Multipurpose Hall will be used by Sunday School for Opening session, VBS etc. * Hall will also be used during Church service as a Virtual Church, and for retreats, seminars, functions etc. * Sunday School Block with 12 classrooms equipped with the latest audio/visual eqpt * State of art conference room * Green building – Maximum use of Natural light, Solar energy and rain water harvesting
13
COST OF CONSTRUCTION TOTAL COST Phase I (Main Building- Total area – 16,000 sft) 340 lakhs (appx'ly) 60 lakhs (appx'ly) Phase 2 (Toilet/ Stores) 4 Crore ( appx'ly)
14
ACTUAL WORK STARTED NOV '13 COMPLETION TIME ( Phase I- Main Building ) 15 Months (Jan' 2015 ) PRE SPRESENT POSITION Phase 1 FOUNDATION COMPLETED AS ON FIRST WEEK OF FEB'14