Presentation is loading. Please wait.

Presentation is loading. Please wait.

Concept of triangulation survey

Similar presentations


Presentation on theme: "Concept of triangulation survey"— Presentation transcript:

1

2 Concept of triangulation survey
triangulation operations are not confined to one area at any one time. Several operations are involved in triangulation. The personnel involved in each phase are usually separated from the personnel performing other phases of the survey. Since different lengths of time are required for the various operations, no standard division of duties can be made. There are general operations that must be performed in triangulation, and each of the survey personnel is assigned to one or more of these functions. The general operations are as follows:

3 Steps in triangulation
Reconnaissance and planning. Determination of angles. Base measurement. Computation Measurment and baseline Electron of signals and tower Measurment of horizontal angle

4 Reconnaissance survey instru ment
Level ins tru ment -01 nos Theodolite -01 nos Compas -01 nos Rainging rod Steal tape Telescope Berometre Heliotrap Umbralla rag ,tabu

5 Selection of station points
 On each point you can see at least two close points.  The angles should be less than 90 degrees.  The points should be at high terrains so it can be reached easily.  The triangle should be equally sided.  The internal angles should measured by the theodolite.

6 Signal: a marker or tower erected at triangulation stations and, sometimes, at traverse stations. Surveying signals are used in mounting geodetic instruments, such as transits, at a height that provides for line of sight to adjacent markers. The distance to the adjacent markers depends on the order of precision of triangulation and ranges from 5–10 km to 30–50 km. Sighting targets are mounted on the surveying signals.

7 Surveying signals may be simple or complex
Surveying signals may be simple or complex. A simple signal consists of two pyramids that do not touch—an inner one and an outer one. The inner pyramid is usually trihedral and serves as a base or mounting for the geodetic instrument.

8 Signal tower A tower from which signals are set or displayed, as by a semaphore, or by any other means of transmitting information or orders to a distance. Specifically, an armored tower or inclosure above the deck of a war-ship to protect the signalmen when hoisting signals in action.

9

10 Height of Eiffel Tower - An Example
Height of Tower Baseline Distance Tangent of Angle of Elevation Height of Man =× + ( )( ) HT HE HM )

11 The Eiffel Tower: • is in Paris, France • built in two years • construction began in 1887 • weighs 7000 tons • has 2.5 million rivets • sways at most 12 cm in high winds • has 40 tons of paint • varies in height up to 15 cm (depending on temperature

12 Height of Tower = (Baseline Distance ×Tangent of Angle of Elevation )+Height( of Man )
HT HE HM Given: Baseline Distance = 355 Meters Angle of Elevation = 40o Height of Man = 2 Meters Find: Height of Tower Using the tangent table, we find that: Tan∠40o = 0.84

13 Height of Tower = (Baseline Distance ×Tangent of Angle of Elevation )+Height( of Man )
355 m X m 298 m m 300 m Answer

14 Procedure: Form teams of two students with the following assignments 1. For practice, students should take turns sighting on various objects from different distances with the altitude finder, including releasing the trigger and reading the angle of elevation. Students should compare results. 2. Students should review what data is to be collected for each altitude measuring event. • angle of elevation • eye level of site • baseline distance .

15 3. Each student is to stand a different distance form the object, and
- measure the baseline distance from the object; - sight the top of the object and read the angle of elevation; - measure height of each observer, and - record the data in the table below

16 4. Use the Table of Tangents to find the tangent of the angles of elevation;
Round the tangent to hundredths. 6. Compute the (height of the object) using the data from the table. Name of Sighters Height Baseline Distance Angle Elevation Tangent of Angle (hundredths)

17 Find the Distance Across the Lake
Roy wishes to find the distance across the lake. From where he is standing he can see the 300 meter high TV tower across the lake. He holds the meter stick at eye level 50 centimeters from his face. He slowly moves the meter stick upwards until its top is in line with the top of the tower. He notes that he has moved the meter stick 30 centimeters. His eye height is 180 centimeters. 1. Label the diagram. 2. Write a proportion that can be used to find the distance, D, across the lake. 3. Solve the proportion to find the distance in meters across the lake.

18 50 cm 300 m 30 cm 180 cm L −180 = 30 50 L : 29820 50 = 30 L 994 = 1 L =994 ×50 =49,700 cm =497 m


Download ppt "Concept of triangulation survey"

Similar presentations


Ads by Google