Maturity of Project Management Criteria for PS Models Nature of PS Models Types of PS Models Uncertainty Analysis and Risk Management Information Base for PS Models Project Portfolio Process (PPP) Project Proposal

2 Ch. 2.0: Overview of PS Process
Project Management Office (PMO): Aligning corporate needs and project goals Project selection: Choose candidate projects using evaluation criteria Dealing with uncertainty: Risk analysis Strategically selecting best projects: Project Portfolio Process (PPP) Locking up the deal: Writing a project proposal

3 Ch. 2.1: Project Management Maturity Levels
Ad-hoc (essentially disorganized) Abbreviated (some processes exist) Organized (standardized processes) Managed (measured processes) Adaptive (continuous improvement)

4 Ch 2.2: PS Models Idealized view of reality
Representing the STRUCTURE of the problem, not the detail Deterministic or stochastic

5 Ch. 2.2: Criteria for Project Selection Models
Realism (technical-, resource-, market-risk) Capability (adequately sophisticated) Flexibility (valid results over large domain) Ease of Use (no expert needed to run model) Cost (much less than project benefit) Easy Computerization (use standard software)

6 Ch. 2.3: Nature of PS models: Caveats
Project decisions are made by PM --- NOT by PS model! A PS model APPROXIMATES, but does NOT DUPLICATE reality!

7 Ch. 2.3: Nature of PS Models: Methodology
Start with detailed list of firm’s goals Create list of project evaluation factors (PEF’s) Weigh every element in PEF list Compute an overall score for project based on weighted PEF’s Select project that has the closest alignment with firm’s goals

8 Ch 2.3: Project Evaluation Factors (PEFs)
Production Factors Marketing Factors Financial Factors Personnel Factors Administrative and Misc. Factors

9 Ch 2.4: Types of PS Models: Nonnumeric
Sacred Cow Operating Necessity Competitive Necessity Product Line Extension Comparative Benefit Model

10 Ch 2.4: Numeric PS Models: Profit / Profitability
Payback Period (PB) Average Rate of Return Discounted Cash Flow (NPV) Internal Rate of Return Profitability Index Other Profitability Models

11 Ch 2.4: Numeric PS Models: Scoring
Unweighted 0-1 Factor Model Unweighted Factor Scoring Model Weighted Factor Scoring Model Constrained Weighted Factor Scoring Model S = ∑(x) S = ∑(s) S = ∑(s·w) S = ∑(s·w) ∏(c)

12 Ch 2.4: Choosing the PS Model
Dependent on wishes and philosophy of management 80% of Fortune 500 firms choose “nonnumeric” PS models Firms with outside funding often choose scoring PS models Firms without outside funding often choose profit / profitability PS models

13 Ch 2.5: Management of Risk: Terminology
Risk: Decision based on complete information about the probability of each possible outcome. Uncertainty: Decision based on incomplete or insufficient data. Game: Decision based under conditions of conflict.

14 Ch 2.5: Areas of Uncertainty
Project timing & expected cash flow. Direct outcome of project, i.e. what exactly will the project accomplish Side effects and unforeseen consequences of project

15 Ch 2.6: Risk Analysis Crystal Ball®2000 Software
Start with estimated risk profile for all key parameters of project Use Crystal Ball®, an EXCEL® plug in, to represent decision by statistical model Repeat many times to get a statistical distribution of all possible outcomes

16 Ch 2.6: Risk Analysis: Crystal Ball®2000 Software
Input of Cash Flow parameter from Psycho Ceramic example

17 Ch 2.6: Risk Analysis: Crystal Ball®2000 Software
Select distribution parameter (Triangular for this example)

18 Ch 2.6: Risk Analysis: Crystal Ball®2000 Software
Output, 1000 Monte Carlo Runs (example:Average Project NPV $10,821)

19 Ch. 2.6: Window-of-Opportunity Analysis
Estimate in advance economic impact of innovation before R&D is undertaken Set up a baseline of current process as the sum of all current subprocesses Compute cost/performance of new innovation as a multiple of each subprocess in the baseline system

20 Ch. 2.6: Problems Affecting Data Used in PS Models
Accounting: arbitrary assignment of overhead costs, linear cost and revenue forecasts Measurements: subjective vs. objective, quantitative vs. qualitative, reliable vs. unreliable, valid vs. invalid Technology shock: New technology has to overcome initial resistance threshold.

21 Ch 2.7: Project Portfolio Process (PPP)
Step 1: Establish a Project Council Step 2: Identify project categories & criteria Step 3: Collect project data Step 4: Assess resource availability Step 5: Reduce project and criteria Set Step 6: Prioritize projects within categories Step 7: Prioritize the projects within categories Step 8: Implement the Process

22 Step 1: Establish a Project Council
Includes: Senior Management Project Managers of major projects Relevant general managers Those who identify key risks Those who could derail PPP later

23 Step 2: Identify Project Categories and Criteria
Derivative Projects Platform Projects Breakthrough Projects R & D Projects

24 Step 3: Collect Project Data
Use “activity based costs” Verify all data Include timing for benefits and resource needs Document assumptions for future checking

25 Step 4: Access Resource Availability
Access availability of Internal and External Resources by: Type Department Timing: can vary 100% over project life cycle

26 Step 5: Reduce the Project and Criteria Set
Narrow down existing projects required competence exists in organization Market for offering Profitability Risk Potential partner to assist with project Right resources available at the right times Good technological fit with organization Uses organization’s strengths Synergetic with other important projects Slipped in desirability

27 Step 6: Prioritize Projects within Categories
Rank projects within each category Measure by Risk Development of new knowledge Consider benefits first Consider cost second

28 Step 7: Select the projects to be Funded and Held in Reserve
Determine the mix of projects across various categories and time periods Leave % of organization’s resources free Focus on committing to FEWER projects

29 Step 8: Implement the Process
Make results of the PPP widely known Senior management must fully fund Process will be repeated on a regular basis

30 Ch 2.8: Project Proposal: Content
Cover letter Executive summary Description and past experience of project team Nature of technical problem to be solved How to approach solution of technical problem Plan for implementation of project Plan for logistic support and administration

31 Ch 2.8: Project Proposal: Cover Letter & Executive Summary
Compose a cover letter as key marketing instrument Explain fundamental nature and general benefits of project Minimally technical language

32 Ch 2.8: Project Proposal: Past Experience of Project Team
List all key project personnel with titles and qualifications Include full resume of each principal Provide all pertinent references

33 Ch 2.8: Project Proposal: Technical Approach
General description of problem to be addressed or project to be undertaken Major subsystems of problem or project Methodology of solving the problem Special client requirements Test and inspection procedures

34 Ch 2.8: Project Proposal: Implementation Plan
Estimates of time, cost and materials for each subsystem and the whole project Establish major milestones to break project into phases List equipment, overhead and administrative cost Develop contingency plans (including slack time)

35 Ch 2.8: Project Proposal: Plan for Administration and Logistic Support
Control over subcontractors Nature and Timing of all reports (progress, budget, audits) Change management Termination Procedures “Touch of class” capabilities (artist’s renderings, meeting facilities, video conferencing, computer graphics)


Download ppt "Ch. 2 Strategic Management and Project Selection"

Similar presentations


Ads by Google