Lakes Creek Road Waste Transfer Station Construction highlights.

Similar presentations


Presentation on theme: "Lakes Creek Road Waste Transfer Station Construction highlights."— Presentation transcript:

1 Lakes Creek Road Waste Transfer Station Construction highlights

2 Site layout

3 Floor plan

4 Last segment of 3

5

6

7

8 Splice and ply packers

9 Average 29.5m

10 Used packers

11 Test pile with gauges

12 Vehicle mounted test rig

13 Rubbish in weigh bridge area excavation

14

15

16

17 Broken pile

18 Fan blowing into weigh bridge excavation

19

20 Site December 2013

21 Site January 2014

22 February rain rain rain

23 Site February 2014

24 Site March 2014

25 Site April 2014

26 Relieving slab

27 Suspended slab – office and amenities

28 Suspended slab – education centre

29 Tip bin - safety gate

30 Tip bin lifting

31 Tip bin tipping

32 Scabbling push pit floor

33 Scabble finish

34 Bobcat scabbler

35 Site May 2014

36 Push pit edge topping steel plate

37

38 Site June 2014

39 Fog system- dust suppression

40 Fog delivery line

41 20000 litre tank- fog and toilets

42 Push pit ready for topping

43 Finishing tipping floor topping

44 Site July 2014

45 Weigh bridge ready for steel floor

46 Grab arm control panel

47 Grab arm

48 Grab

49 Placing asphalt

50 Guard rail post installer

51 Site August 2014

52 Bio-retention drain

53

54 Site September 2014

55 Continuous flight auger drill rig and reo cages

56 Grout agitator and pump

57 Lifting reo cages

58 General view of new sewer alignment

59 450 sewer under by pass while new manhole and MSCL pipe are constructed

60 750 MSCL pipe supported on concrete beam